Laserfiche WebLink
Calvin, Giordano & Associates, Inc. <br /> A SAFEbuilt Company <br />City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 27 <br />Bal Harbour CIP Projects <br />Bal Harbour Civil Engineering Projects <br />Bal Harbour Village Engineering Services (Ongoing) <br />655 96th Street <br />Bal Harbour, Florida 33154 <br />Contact Information: <br />Mike Alvarez, CGC, PWLF <br />Utility Compliance Officer <br />Tel No.: 786.566.3562 <br />Email: MAlvarez@balharbourfl.gov <br />CGA has provided continuing professional services to <br />the Bal Harbour Village since 2017. Services include: <br />CGA began providing professional services to Bal <br />Harbour Village in 2017. Currently, CGA has a Continuing <br />Engineering Services Agreement with Bal Harbour Village <br />in order to assist the Village in various design projects <br />and plan review services. These services include Civil <br />Engineering, Electrical Engineering, Surveying, GIS, and <br />Construction Services. <br />Contract Amount: <br />Multiple Contracts - specific contract information <br />available upon further request from the Village. <br />Ongoing services for Bal Harbour Village: <br />• Building Department Public Works Plan Review <br />and Utilities Plan Review <br />• Sunshine 811 Services – Manage Dig Tickets <br />and Design Ticket Response <br />• Florida Department of Environmental Protection <br />– NPDES Annual Reporting, MDC MS4 TMDL <br />Prioritization Plan and Assessment Plan <br />• Miami-Dade County Department of Regulatory <br />and Economic Resources Reporting – Sanitary <br />Sewer System Modeling and Water Usage <br />Reporting <br />• GIS Database Verification and Updates – Water, <br />Sewer, Drainage, and Site Lighting <br />• Pump Station No. 1 Drainage Improvements <br />– Project Management, Bidding, Engineering <br />During Construction, and Construction <br />Services <br />• Phase-3(a) Infrastructure Improvements – <br />Project Management, Civil Engineering Design, <br />Bidding, Engineering During Construction, and <br />Construction Services <br />• Phase-2(b) Water Main Replacement – Project <br />Management, Exploratory Investigation via <br />Geotechnical Engineering and Subsurface <br />Underground Exploratory <br />• Park Dr. 16” WM Abandonment and <br />Replacement Review – QA/QC of the design <br />plans, Construction Services.