My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc. Bid Document (32)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Calvin, Giordano & Associates, Inc
>
Calvin, Giordano & Associates, Inc. Bid Document (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:55:09 PM
Creation date
8/31/2026 12:52:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 29 <br />Client <br />City of Coral Gables <br />2800 SW 72nd Avenue <br />Miami, FL 33155 <br />Contact Information at Time of Project: <br />Grettel Duran <br />Project Architect <br />Tel: 305.460.5053 <br />GDuran@coralgables.com <br />Project Date <br />2019 - 2022 <br />Services Provided <br />Landscape Architecture <br />Civil Engineering <br />Surveying <br />Hardscape Design <br />Irrigation Design <br />Renderings <br />Firm’s Fees <br />$ 69,655.00 <br />Construction Cost <br />$ 421,500.00 <br />In 2019, Calvin, Giordano & Associates, Inc. was contracted by the City of Coral Gables to <br />provide design services for one of the City’s parks, located just north of the main entrance to <br />the Venetian Pool. The development of this new park space was to be partially funded by The <br />Garden Club and dedicated to honor Mrs. Lamar Louise Curry, one of their most distinguished <br />members. One of the tasks was to prepare a conceptual design for the park to incorporate a <br />passive space for families with small children to wait while other family members visit the <br />Venetian Pool. Several conceptual plan options were prepared for review by the City staff, and <br />as a result, the final plan featured an open space play area, two shaded seating areas, two <br />raised planter boxes, and a rock garden that will function as a water filtration system for the <br />overspill water from the Venetian Pool. A diverse palette of tropical trees and flowering plant <br />material was also selected and approved by the Garden Club. <br />CGA’s Landscape Architecture staff assisted the City’s Project Management team with <br />this effort by preparing detailed construction documents for the demolition, new site plan, <br />landscaping, fencing, irrigation design, walkways, lighting, and water features in the park. <br />CGA’s Civil Engineering staff developed plans for additional drainage and sidewalk/crosswalk <br />improvements to further enhance the area surrounding the park. Permitting, bidding, and <br />construction observation were also part of the contract. <br />The scope of work for the project includes the following: 1) Updated tree and boundary survey <br />of the space; 2) Conceptual master plan and renderings; 3) Budget of anticipated construction <br />costs to accompany master plan concepts; 4) Two community meeting presentations with <br />color rendered site plan and image boards; and 5) Preparation of construction drawings and <br />providing bidding and construction services. <br />The project was completed on June 7, 2022. <br />LAMAR LOUISE CURRY PARK <br />Coral Gables, FL
The URL can be used to link to this page
Your browser does not support the video tag.