My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc. Bid Document (32)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Calvin, Giordano & Associates, Inc
>
Calvin, Giordano & Associates, Inc. Bid Document (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:55:09 PM
Creation date
8/31/2026 12:52:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 69 <br />E <br />BS, Civil Engineering <br />University of Dayton <br />L C <br />Florida Board of Professional Engineers <br />Professional Civil Engineer #70870 <br />Florida Department of Environmental <br />Protection <br />Stormwater, Erosion Control, and Sedimentation <br />Qualifi ed Stormwater Management Inspector <br />#13907 <br />Occupational Safety and Health <br />Administration (OSHA) <br />10-Hr OSHA Training in Construction Safety and <br />Health <br />W H <br /> Senior Project Manager <br />Calvin, Giordano, and Associates (CGA), a <br />SAFEbuilt Company, Ft. Lauderdale, FL <br />2014 – Present <br /> Project Engineer <br />Keith and Associates, Pompano Beach, FL <br />2012 – 2014 <br /> Professional Engineer <br />TDM Consulting, Inc., Ft. Myers, FL <br />2006 – 2012 <br /> Project Manager <br />Neese and Associates <br />2005 – 2006 <br />P E <br /> Civil Engineer <br />CGA contract with Florida Department of <br />Environmental Protection (FDEP) <br />Continuing services contract with FDEP, PM and <br />EOR for this septic tank conversion project on <br />the state-owned lands located at Oleta River <br />State Park in North Miami. <br /> Engineer-of-Record/Project Manager <br />Zachary Taylor State Park Overfl ow Parking <br />Lot - Key West, FL <br />Lead designer for the overfl ow parking lot <br />to serve the park. Parking lot modifi cations <br />included driveway connectivity to provide <br />additional parking during peak season park <br />attendance. <br /> Civil Engineer <br />CGA contract with the City of North Miami <br />Beach, FL <br />Continuing services contract with FDEP, PM <br />and EOR for this septic tank conversion project <br />on the state-owned lands located at the Oleta <br />River State Park within the City. <br /> Civil Engineer <br />CGA contract with the City of Boca Raton, FL <br />Led the design efforts for this proposed <br />water main improvements Boca Bath and <br />Tennis Water Main Improvements project. <br /> Civil Engineer <br />CGA contract with the City of Boca Raton, FL <br />Engineer of Record for the Boca Sewer <br />Manhole project. Design included <br />replacement of several existing manholes <br />at two project sites due to the presence of <br />unsuitable soils. <br /> Civil Engineer <br />CGA contract with the City of Boca Raton, FL <br />Engineer of Record for the Sunfl ower <br />Townhouse Water Main Improvements <br />project. Services included oversight of <br />design for the small diameter water main <br />replacement project played an important <br />role. <br /> Engineer of Record <br />CGA contract with the City of Hallandale <br />Beach, FL <br />Engineer of Record for the SW Quadrant <br />Drainage Improvement project which <br />includes major enhancements to the <br />existing drainage system within the City’s <br />SW Quadrant to reduce the fl ooding during <br />large storm events by isolating the system <br />from tidal infl uence and pumping the <br />stormwater into proposed injection wells. <br /> Civil Engineer <br />CGA contract with the City of Oakland Park, <br />FL <br />Project Engineer and lead designer for the <br />Lloyd Estates lift station out parcel for an <br />improved stormwater management system <br />to aid in the reduction of fl ood duration and <br />elevation during storm events. <br /> Civil Engineer <br />CGA contract with the City of Dania Beach, FL <br />Project Manager for initial design and <br />permitting for the improvements contained <br />in the recommendation of the Storm Water <br />Master Plan of Basin 5, Phase II. <br /> Civil Engineer <br />CGA contract with the City of Hollywood, FL <br />Project Engineer for the construction of a <br />solarium addition to the existing Memorial <br />Hospital South facility in Hollywood, Florida. <br /> Engineer-of-Record/Project Manager <br />Memorial Regional Hospital Force Main and <br />Lift Station Upgrades - Hollywood, FL <br />Project engineer for the project scope <br />consisting of removing the existing master & <br />new parking garage pump stations, grouting <br />existing force main, installing new tri-plex <br />submersible pump station and piping, new <br />top slab with an access hatch and safety <br />grate, new gravity sewer, upgrading the <br />internal control panel appurtenances, and <br />replacing the force main with 12-inch HDPE <br />pipe. <br /> Engineer-of-Record/Project Manager <br />Memorial Hospital South Solarium - <br />Hollywood, FL <br />Project Engineer for the construction <br />of a solarium addition to the existing <br />Memorial Regional Hospital South (MRHS) <br />facility located in Hollywood. Design of <br />the solarium included an ADA accessible <br />entrance, drainage modifi cations, parking <br />lot reconfi guration, along with pavement <br />marking and signage improvements for the <br />existing facility. <br />J “J” M, PE <br />Water/Sewer Engineer <br /> Y E Y F
The URL can be used to link to this page
Your browser does not support the video tag.