Laserfiche WebLink
City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 77 <br />P C K-M, PE, PTOE <br />Transportation/Transit/Traffi c Engineering Team Lead <br /> Y E Y F E-S B <br />E <br />MS, Civil Engineering <br />Florida Atlantic University <br />BS, Civil Engineering <br />Universidad de Costa Rica <br />L C <br />State of Florida <br />Professional Engineer #97697 <br />Transportation Professional Certifi cation <br />Board (TPCB) <br />Professional Traffi c Operations Engineer (PTOE) <br />W H <br /> Lead Traffi c Engineer <br />Calvin, Giordano & Associates, Inc. <br />2022 – Present <br /> Graduate Research Assistant <br />Florida Atlantic University <br />2020 – 2022 <br /> Design Engineer <br />RQ Ingeniería-INTRA Consultores <br />2017 – 2022 <br />P E <br /> Lead Traffi c Engineer <br />Miami Beach Pedestrian Priority Zone <br />Miami Beach, FL <br />2024 - 2025 <br />As Lead Traffi c Engineer, Mr. Chon Kan- <br />Munoz oversaw the traffi c engineering <br />and design services for multimodal <br />improvements along Lincoln Road Mall <br />and within Flamingo Park. The primary <br />assignment consisted of the preparation <br />of construction plans for pedestrian, <br />bicycle, accessibility, and roadway <br />improvements, including high-emphasis <br />crosswalks, ADA-compliant curb ramps, <br />bicycle parking facilities, raised crosswalks, <br />signing and pavement markings, drainage <br />improvements, and associated roadway <br />modifi cations. <br /> Lead Traffi c Engineer <br />Miami Beach Sunset Harbour Traffi c Study <br />Miami Beach, FL <br />2022 - 2025 <br />As Lead Traffi c Engineer, Mr. Chon Kan- <br />Munoz oversaw this study, which aimed <br />to analyze the current traffi c conditions in <br />this neighborhood to address speeding, <br />visibility obstructions, and pedestrian <br />crossings at undesignated locations, in order <br />to formulate actionable recommendations <br />for improving overall traffi c safety and <br />effi ciency. <br /> Lead Traffi c Engineer <br />Emerald Estates Drive Traffi c Study <br />Weston, FL <br />2023 - 2025 <br />Oversaw this corridor study consisting <br />of a pedestrian safety evaluation and <br />an operational analysis of three (3) <br />intersections along Emerald Estates Drive. <br />This evaluation included an assessment of <br />the need for a midblock pedestrian crossing <br />in accordance with the criteria established <br />in the 2024 FDOT Traffi c Engineering <br />Manual (TEM), a review of the most recent <br />three years of available crash data, and an <br />evaluation of existing operating speeds. <br /> Lead Traffi c Engineer <br />Memorial Regional Hospital Expansion <br />Traffi c Study <br />Hollywood, FL <br />2024 - 2025 <br />Oversaw the traffi c engineering services for <br />this Traffi c Impact Study for the Memorial <br />Regional Hospital (MRH) Surgical & Critical <br />Care Tower Expansion. The study evaluated <br />the operational impacts of the proposed <br />expansion under existing, future no-build, <br />and future build conditions through the <br />anticipated project completion in 2030. <br />The analysis included eight (8) study <br />intersections and four (4) roadway segments <br />surrounding the hospital campus. <br /> Lead Traffi c Engineer <br />Multimodal Mobility Study <br />Medley, FL <br />2022 - 2024 <br />Conducted this Multimodal Mobility Study <br />and Impact Assessment to improve the <br />transportation conditions within the Town, <br />including bicycling, walking, and public <br />transit options for South River Drive from <br />NW 116th Way to NW 87th Avenue. <br /> Lead Traffi c Engineer <br />Ocean Drive & Lummus Park Improvements <br />Miami Beach, FL <br />Ongoing <br />The Traffi c Impact Study was comprised of <br />the analysis of 64 intersections and the <br />modeling of the confi gurations proposed <br />in the Vision Plan of the Art Deco Cultural <br />District of the City of Miami Beach. <br /> Traffi c Engineer <br />Lyons Rd. and Winston Park Blvd. <br />Medley, FL <br />This project involved replacing the existing <br />span wire traffi c signal system with a <br />new mast arm traffi c signal system. The <br />scope of work included ADA upgrades, <br />signalization improvements, intersection <br />lighting analysis, structural support systems <br />including foundations. <br /> Traffi c Engineer <br />Polk St. and N. 24th Ave. <br />Coconut Creek, FL <br />This project involved replacing the existing <br />span wire traffi c signal system with a new <br />mast arm traffi c signal system. The scope of <br />work included milling and resurfacing the <br />intersection and approaches, ADA upgrades, <br />signalization improvements, intersection <br />lighting analysis, structural support <br />systems including foundations, signing and <br />pavement markings. <br /> Traffi c Engineer <br />Las Olas Boulevard and SE 3rd Avenue <br />Signalizations <br />Fort Lauderdale, FL <br />This project involved replacing the existing <br />span wire traffi c signal system with a new <br />mast arm traffi c signal system. The scope of <br />work included milling and resurfacing the <br />intersection and approaches, ADA upgrades, <br />signalization improvements, intersection <br />lighting analysis, structural support <br />systems including foundations, signing and <br />pavement markings, and more. <br /> Traffi c Engineer <br />NW 31st Avenue and NW 19th Street <br />Intersection Improvements <br />Fort Lauderdale, FL