My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colliers Engineering & Design Bid Document (18)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Colliers Engineering & Design
>
Colliers Engineering & Design Bid Document (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:00:27 PM
Creation date
8/31/2026 12:59:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Page 1 | 4 <br />PPRROOPPOOSSEEDD EEXXCCEEPPTTIIOONNSS <br />CITY OF SUNNY ISLES BEACH <br />RFQ # 26-07-01 <br />CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING <br />CONSULTING SERVICES (CCNA) <br /> <br />Proposed Exceptions to Sample Draft CCNA Template <br />4.3 Intentionally Omitted. Delay Damages (Liquidated Damages). As to this Agreement, or <br />Project Agreements or Letter Agreements, that have deadlines, time will be of the essence unless <br />stated otherwise. In the event the work or Services are not completed within the time specified, the <br />City will suffer damages, the amount of which is difficult if not impossible to ascertain. It is agreed, <br />therefore, that from the compensation otherwise to be paid to the Consultant, the City may retain <br />the sum of FIVE HUNDRED Dollars ($500.00) per calendar day for each day thereafter, S undays and <br />holidays included, that the Work or Services remains uncompleted. This sum shall represent <br />liquidated damages that the City will have sustained per calendar day from the inconvenience and <br />expense caused to the City by the delay in the completion of the Work or Services. This sum is not a <br />penalty, being the liquidated damages the City will have sustained in event of such default by the <br />Consultant. The City reserves the right to additionally recover direct expenses incurred during the <br />period of any delay. The Consultant shall be liable for liquidated damages even if the Agreement, <br />Project Agreement, or Letter Agreement is terminated by the City for cause or if the Consultant <br />abandons the Work or Services. <br />Reason for Liquidated Damages Exception <br />If a dispute arises over delay damages, the City shall have the burden of substantiating the damages <br />associated with the delay. <br /> <br />SECTION 15 INSURANCE <br />15.1.1 Comprehensive General Liability Insurance. Consultant shall be required to purchase, <br />maintain, and keep in full force, effect, and good standing, Comprehensive General Liability with <br />primary limits of One Million Dollars ($1,000,000) per occurrence and Two Million Dollars <br />($2,000,000) aggregate during the initial and any renewal term of this Agreement. Coverage must be <br />afforded on a form no more restrictive than the latest edition of the Comprehensive General Liability <br />policy, without restrictive endorsements, as filed by the Insurance Services Of fice, and must include: <br />• Broad Form Property Damage <br />• Broad Form Contractual Coverage applicable to this specific Contract, <br />Reason for Insurance Exception <br />Colliers Engineering & Design 70
The URL can be used to link to this page
Your browser does not support the video tag.