My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith & Associates Bid Document (36)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Craig A. Smith & Associates
>
Craig A. Smith & Associates Bid Document (36)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:01:56 PM
Creation date
8/31/2026 1:00:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Craig A. Smith & Associates <br />Engineers ● Surveyors ● Subsurface Utility Engineering ● 3D Subsurface Imaging ● Utility Coordination <br /> <br />David Lookabill <br />Director of Survey <br />Survey/Geomatics Department <br /> <br />Mr. Lookabill has 42 years of experience in the <br />survey, engineering and utility construction <br />fields. <br /> <br />Mr. Lookabill began his surveying career as a Rod Man quickly advancing to <br />Survey Crew Leader and Survey Coordination Manager. He has varied <br />experience in many facets of surveying. He also has vast experience in utility <br />construction such as directional drilling and fuel pipe line staking and as <br />builts performed across the United States. Mr. Lookabill has been employed <br />by CAS since 2014 as a Survey Crew Leader and promoted to Survey <br />Coordination Manager. <br /> <br />Responsibilities include field management, client field coordination, survey <br />crew management and quality control in the field. <br /> <br />Selected Relative Experience: <br />Miami-Dade Water and Sewer Department Force Main 604 Replacement, <br />Miami-Dade County, Florida. Surveying within the Rights of Ways of NW SW <br />113th Place and SW 224th Street east to SW 109th Avenue for sewer force <br />main replacement within heavily populated area. Primary and secondary <br />horizontal control points were established utilizing RTK GPS methods. <br />Vertical control was established by a differential level loop based on Miami- <br />Dade County Benchmarks. Route spanned approximately ¾ miles. <br />Florida Highway 92 Improvements, Lakeland, Florida. Survey for <br />engineering re-design along Highway 92 from North Galloway Road to <br />North Wabash Avenue. Primary and secondary horizontal and vertical <br />control points were established by “leap frogging” multiple base stations <br />1.5 to 2 hour sessions and then processed through the OPUS software <br />routine. Boundary monumentation was located by (4) 1-minute <br />observations done in pairs at intervals of at least 3 hours. <br />Interstate 95 Improvements, Palm Beach County, Florida. Survey for <br />engineering re-design along Interstate 95 in Palm Beach County from <br />Indiantown Road to PGA Boulevard. Primary and secondary horizontal and <br />vertical control points were established by “leap frogging” multiple base <br />stations 1.5 to 2 hour sessions and then processed through the OPUS <br />software routine. Boundary monumentation was located by (4) 1-minute <br />observations done in pairs at intervals of at least 3 hours. <br />FDOT Weight Station, Martin County, Florida. Survey for construction <br />staking along Interstate 95 in Martin County, Florida, north of Indiantown <br />Road. Horizontal and vertical control points were established by the design <br />survey company contracted by the FDOT and confirmed in the field <br /> <br />Areas of Expertise <br />•Land Surveying <br />•Boundary / Topo <br />•Lot Surveys <br />•Control Surveys <br />•Utility Surveys <br />•3D Radar Tomography <br />•GPS <br />•Route Surveys <br />•Crew Supervision <br />•Construction Layout <br />•Quantity Surveys and <br />Calculations <br />•Utility Coordination <br />•Directional Drills <br /> <br />Education <br />•MSI, Port Saint Lucie, <br />Florida – 2011, A.S. <br />•Indian River Community <br />College, Stuart, Florida – <br />2006, Survey Law <br />•Davidson County <br />Community College, <br />Lexington, NC – 1997, <br />AutoCAD 1 & 2 <br />•Guilford Technical <br />Community College, <br />Jamestown, NC – 1988, <br />Civil Drafting and Civil <br />Engineering CAD/CADD <br /> <br />Employment with CAS: 12 yrs <br />Employment with other firms: <br />30 yrs <br /> <br /> <br />54
The URL can be used to link to this page
Your browser does not support the video tag.