Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Nitesh Goli, P.E. PMP <br />RADISE International, L.C. <br />Senior Geotechnical Engineer <br />Mr. Nitesh Goli has over 8 years of experience in providing inspections, geotechnical engineering services for water resources, <br />transportation and commercial building projects. He is skilled in providing soils borehole logging, pre and post construction surveys, <br />vibration monitoring and visual classifications (ASTM D2488). <br /> <br />He is experienced in analyzing geotechnical data, performing the appropriate field site inspections and monitoring, calculations <br />and preparing geotechnical and technical reports. He has also managed, supervised and met with contractors on site, and advised <br />on civil engineering issues. <br /> <br />PROFESSIONAL REGISTRATION AND CERTIFICATIONS <br />• Professional Engineer, FL (PE100769) <br />• PMP Certified <br />• FDOT/CTQP QC Manager <br />• PCI Certified Level 1and 2 Quality Control Inspector <br />• FPCA & CMEC 450 Specification Certification <br />• PTI Certified Level 1 and 2 Unbonded PT Field Installer/ Inspector <br />• APNGA Portable Nuclear Gauge Safety & USDOT Hazmat Certification <br />• Smart Pile Data Acquisition and Review- Level 1 <br />• ACI Concrete Field Testing <br /> EDUCATION <br />• M.S. Civil Engineering, Florida Atlantic University- Florida <br />• M.S. Geotechnical Engineering, JNT University, Hyderabad, India <br />• Diploma in Project Management, HC University, Hyderabad, India <br />• B.S. Engineering, Osmania University, Hyderabad, India <br /> <br />REPRESENTATIVE EXPERIENCE Hollywood Water Treatment Plant – Hollywood, FL Senior Geotechnical Engineer Served as the Senior Geotechnical <br />Engineer responsible for managing field investigations and geotechnical engineering activities for modifications to the Air Blower <br />Pump Station (ABPS) Building at the Hollywood Water Treatment Plant. Coordinated utility clearance activities, GPR and <br />electromagnetic utility locating, concrete coring, hand auger borings, Dynamic Cone Penetrometer (DCP) testing, groundwater <br />measurements, soil logging, and laboratory testing. <br />Bob Butterworth Park COVID Memorial, Hollywood, FL Senior Geotechnical Engineer Managed the field investigation and <br />geotechnical engineering services for the proposed Bob Butterworth Park COVID Memorial. Responsibilities included coordinating <br />Standard Penetration Test (SPT) borings, groundwater measurements, exfiltration testing, laboratory testing, and engineering <br />evaluations of subsurface conditions. Performed geotechnical analyses and prepared recommendations for shallow foundations, <br />site preparation, earthwork, utility trench construction, pipe bedding, dewatering, and construction support. <br /> Broward County Mast Arms, Broward Co., FL. Senior Geotechnical Engineer -- Field exploration/testing and laboratory testing <br />for 20 planned intersections for mast arm traffic signal conversions and pavement improvements. Provided laboratory testing, <br />asphalt core services and pavement evaluation. <br />I-75 Express Lanes – Segment E, Broward County, FL. Senior Geotechnical Engineer -– Provided geotechnical engineering <br />services for the improvements along the I-75 (SR9) corridor. The length of the project was about 12 miles from the Miami-Dade <br />County/Broward County line to North of I-595 Interchange. <br />76