Laserfiche WebLink
Larry M. Smith, P.E. <br />Principal Electrical Engineer <br /> <br />Fort Lauderdale, Florida 🏠🏠 <br /> (954) 353-4559 ext. 202 ☎ <br /> (561) 818-3600 📱📱 <br /> Larry@SmithEngineeringConsultants.com ✉ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project Experience <br />City of West Palm Beach Lift Station SCADA Upgrade - Smith Engineering Consultants designed the replacement of <br />the City’s existing base station and RTU’s that serve over 100 lift stations throughout the City of West Palm Beach. <br />The existing SCADA system was comprised of several different types of RTU’s along with proprietary base station <br />software that was not able to accommodate RTU’s with an open communications protocol. Therefore SEC specified <br />a new base station, including both system hardware and software, to allow different types of RTU’s to be installed <br />in the field that previously would not have been able to communicate with the base station. We also specified the <br />new RTU’s to replace those RTU’s at the lift stations that were aging and in need of replacement. This new SCADA <br />system provided the necessary flexibility that helped the City to save operating and maintenance costs by allowing <br />for non-proprietary, lower cost RTU’s to be installed throughout their service territory. <br />City of West Palm Beach Flagler Drive Wastewater Pump Stations - This award winning project included the <br />replacement of a wastewater force main pipeline, and the rehabilitation of two (2) existing pump stations. Pump <br />Station No. 3’s submersible pumps were replaced to meet the new flow and head requirements. Control panel <br />upgrades were designed to accommodate the parameters of the new submersible pump motors. At Pump Station <br />No. 5, a new electrical service (including a City-owned step-up transformer) was designed to handle the additional <br />electrical load of the station. A replacement of the three (3) existing VFD’s was accomplished within the existing <br />motor control center. Provisions to connect a portable generator through a manual transfer switch were also <br />provided. <br />City of West Palm Beach Lift Station Improvements and Rehabilitation (LS Nos.: 4, 7, 44, 52, 75, 74, and 153) - This <br />project consisted of the rehabilitation of several existing lift stations and included electrical design, including power, <br />controls, instrumentation and telemetry/SCADA for the installation of new pump control panels and remote <br />telemetry units (RTU’s), throughout the City of West Palm Beach’s service area. <br />Lilac Street and Military Trail Intersection, Palm Beach County, Florida - Electrical engineer of record for the design <br />and construction management of a new signalized intersection for Palm Beach Gardens High School. New mast arm <br />signal poles were designed along with their associated electrical services. Larry prepared signal timing diagrams <br />through the application and interpretation of traffic flow and signal timing models. These were included within the <br />signal plans on the plan sheets and signed & sealed accordingly. <br />Clematis Streetscape Lighting 100, 200, 400 & 500 Blocks, City of West Palm Beach, Florida - Electrical engineer of <br />record for the design of the ongoing design-build streetscape project. Responsible for design of electrical systems, <br />including new decorative lighting poles and fixtures, along Clematis Street and Narcissus Ave. The electrical systems <br />include new electrical service and power for vendor receptacles and photoelectric controlled street lights. Plans also <br />include tree up-lighting and power receptacles for holiday lights. Calculations for the roadway illumination were <br />made in accordance with city requirements, and light pole details prepared to match the existing decorative lighting <br />on recently constructed 300 Block project. <br />City of West Palm Beach Fern Street Lighting - Smith Engineering Consultants, Inc. designed the electrical systems, <br />including new decorative lighting poles and fixtures, for the sidewalks along Fern Street between Tamarind Avenue <br />and South Olive Avenue. The electrical systems included a new electrical service and power distribution for <br />photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance with city <br />requirements, and light pole details prepared for the selected decorative lighting. <br />78