My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Crain Atlantis, Inc. Bid Document (16)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Crain Atlantis, Inc
>
Crain Atlantis, Inc. Bid Document (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:02:41 PM
Creation date
8/31/2026 1:01:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />WINSTON TOWERS 500 <br />Sunny Isles Beach, Florida <br />Client: Winston Towers 500 Condominium Association <br />Reference: Daniel Collot, Property Manager <br />Status: Ongoing relationship since 2018 <br />Services: Architecture • Civil • Structural • Electrical • Special Inspections • Construction Administration <br />PROJECT OVERVIEW <br />Since 2018, Crain Atlantis has provided ongoing <br />architectural and multidisciplinary engineering <br />services for Winston Towers 500, an occupied <br />high-rise condominium in Sunny Isles Beach. <br />What began as a structural analysis and repair <br />assignment expanded into multiple assignments <br />covering building evaluation, restoration, <br />permitting, and construction. <br />REPRESENTATIVE ASSIGNMENTS <br />• 418 Balcony Inspections & 40-Year <br />Structural Certification <br />• Fire Evaluations & Letters <br />• Pool Remedial Investigation <br />• 50 Additional Balcony Inspections <br />• Unit 1703 Analysis & Repair Program <br />• Balcony, Railing & Waterproofing Restoration <br />• Impact-Resistant Window Improvements <br />• Pool, Porte-Cochere & Garage Renovations <br />• Electrical System Evaluation & Report <br />CRAIN ATLANTIS' ROLE <br />Investigation & Assessment <br />Performed structural and building-condition evaluations, special inspections, <br />and electrical system assessment. <br />Design & Documentation <br />Prepared architectural, structural, and MEP construction/design documents, permitting plans, bid <br />specifications, repair documents, and technical reports. <br />Permitting & Coordination <br />Coordinated documentation required for City permitting and multidisciplinary implementation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.