My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Crain Atlantis, Inc. Bid Document (16)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Crain Atlantis, Inc
>
Crain Atlantis, Inc. Bid Document (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:02:41 PM
Creation date
8/31/2026 1:01:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />SECTION 8 <br />Schedule of Available Services <br /> <br />Responsive. Flexible. Ready to Mobilize. <br />Crain Atlantis understands that the success of a continuing professional services contract <br />depends upon the consultant's ability to respond promptly as individual needs arise. <br />Because assignments may vary considerably in scope, complexity, discipline, and <br />urgency, Crain will work closely with the City of Sunny Isles Beach to establish an <br />appropriate schedule for each task based upon the City's priorities and required <br />completion dates. <br /> <br />Upon authorization of an assignment, Crain's Project Manager will coordinate with City <br />staff to confirm the scope of services, identify required disciplines, establish project <br />milestones, and assign the appropriate personnel. Our multidisciplinary structure allows <br />Crain to quickly assemble project-specific teams and adjust staffing as necessary <br />throughout an assignment. <br /> <br />AVAILABILITY & PROJECT MOBILIZATION <br /> <br />Assignment Authorization <br />Upon receipt of a task assignment, Crain will promptly review the City's requirements and <br />coordinate with City staff to confirm the scope, objectives, schedule, and required <br />deliverables. <br /> <br />Project Team Mobilization <br />The appropriate architectural, civil, electrical, CEI, and supporting technical personnel will <br />be assigned based upon the specific requirements of each project. <br /> <br />Project-Specific Scheduling <br />A detailed schedule will be developed for each assignment, identifying applicable <br />milestones for investigation, design, permitting, bidding, construction, inspection, and <br />closeout. <br /> <br />Concurrent Assignments <br />Crain's multidisciplinary staff and project management structure allow the firm to support <br />multiple assignments concurrently while maintaining appropriate staffing, communication, <br />quality control, and schedule oversight. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.