My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SunnyislesBch+CrainAtlantis
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Crain Atlantis, Inc
>
SunnyislesBch+CrainAtlantis
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:03:25 PM
Creation date
8/31/2026 1:02:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />LEE COUNTY SCHOOL DISTRICT <br />Gulf Middle School - Cape Coral, Florida <br /> <br />Client: School District of Lee County <br />Reference: Alina Morales <br />Contract: Continuing Professional Services <br />Services: Architecture • Civil • Structural • Mechanical • Electrical • Plumbing • Fire Protection <br />PROJECT OVERVIEW <br />Crain Atlantis provides as-needed professional services to the School District of Lee County under a <br />continuing services contract that encompasses architecture and multidisciplinary engineering. Under <br />this contract, Crain was authorized in 2023 to provide professional engineering services for the Gulf <br />Middle School Chilled Water Piping Renovation, a fast-track campus-wide infrastructure improvement <br />project. <br />CRAIN ATLANTIS' ROLE <br />Campus-Wide Infrastructure Improvements <br />The baseline scope included removal and replacement of the existing Schedule 40 steel chilled-water <br />supply and return piping throughout the campus. <br /> <br />Mechanical Equipment Replacement <br />An approved add-alternate expanded the project to include complete removal and replacement of 10 <br />rooftop units. The overall project ultimately included the replacement of chilled-water piping, 10 air- <br />handling units, new rooftop units, 25 exhaust fans, and 104 variable air-volume boxes. <br /> <br />Electrical, Controls & Energy Management <br />A second add-alternate included campus-wide removal and replacement of the existing energy <br />management system, including controls, wiring, and associated components, demonstrating Crain's <br />ability to coordinate electrical and control systems with major mechanical infrastructure <br />improvements. <br /> <br />Fast-Track Project Delivery <br />The District required an accelerated design and construction schedule. Crain coordinated closely with <br />the School District and contractors to advance the work within the compressed timeframe. <br /> <br />Successful Project Performance <br />Despite the fast-track schedule and extensive campus-wide scope, the project was completed under <br />budget and ahead of schedule. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.