My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SunnyislesBch+CrainAtlantis
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Crain Atlantis, Inc
>
SunnyislesBch+CrainAtlantis
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:03:25 PM
Creation date
8/31/2026 1:02:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />SOUTH OCEAN VILLAS CONDOMINIUM <br />Highland Beach, Florida <br /> <br />Client: South Ocean Villas Condominium <br />Reference: Kelli Bussan, BOD <br />Services: Architecture • Civil • Structural • Mechanical • Electrical • Plumbing • Building <br />Evaluation • Construction Administration <br />PROJECT OVERVIEW <br />South Ocean Villas retained Crain Atlantis to perform a comprehensive Professional Engineering <br />Turnover Study, including detailed site assessment and investigation of critical building systems. <br />Crain evaluated roofing, MEP systems, fire alarm systems, ADA components, code compliance, and <br />overall quality of construction. The team also reviewed as-built documents to determine whether <br />construction conformed to the original design and engineering requirements. <br />CRAIN ATLANTIS' ROLE <br />Building Investigation & Assessment <br />Performed a comprehensive engineering turnover investigation addressing building conditions, code <br />compliance, system performance, and construction quality. <br /> <br />Multidisciplinary Systems Evaluation <br />Evaluated roofing, mechanical, electrical, plumbing, fire alarm, and ADA components and reviewed <br />as-built documentation to verify compliance with the original design and engineering specifications. <br /> <br />Deficiency Identification & Remedial Design <br />Crain's investigation identified improperly installed systems and conditions that contributed to water <br />intrusion and efflorescence in both structures. The Association subsequently retained Crain to assist <br />with development of corrective repairs. <br /> <br />Construction Documents & Bidding <br />Prepared detailed construction documents addressing structural, electrical, and architectural <br />improvements, together with bid specifications for the remedial work. <br /> <br />Construction Administration <br />Provided comprehensive construction administration to help ensure the nearly $2 million remedial <br />repair program complied with applicable technical and regulatory requirements. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.