My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SunnyislesBch+CrainAtlantis
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Crain Atlantis, Inc
>
SunnyislesBch+CrainAtlantis
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:03:25 PM
Creation date
8/31/2026 1:02:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING <br />SERVICES (CCNA) <br />Page 41 <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />REFERENCE QUESTIONNAIRE <br />It is the responsibility of the proposer to provide a minimum of three (3) different references other than City <br />of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so <br />may result in the rejection of your submission. <br />Giving reference for: (Firm) _______________________________________________________________ <br />Firm giving Reference: ____________________________________ _______________________________ <br />Phone: ____________________________________________ <br />Email: ___________________________________________ <br />1.Q: Rate the firm’s success in providing their services as it relates to the project. <br />A: <br />2.Q: Rate the competence and accessibility of the personnel directing, supervising and <br />performing the work on your project. <br />A: <br />3.Q: Would you use them again? <br />A: <br />4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel <br />necessary to successfully complete your project? <br />A: <br />5.Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates <br />and content? <br />A: <br />6.Q: Is there anything else we should know, that we have not asked? <br />A: <br />The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and <br />are made independently, free from vendor interference/collusion. <br />Name: _______________________________________ Title _____________________________________________ <br />Sign Name: __________________________________ Date: ___________________________________________ <br />Crain Atlantis, Inc. <br />Winston Towers 500 / Daniel Collot, Property Manager <br />305-931-2628 <br />Don-pm@wt500.org <br />The Firm was succesful in providing the required services for the project. They demonstrated professionalism, expertise and commitment to achieve the projecst's objectives. Their work was instrumental to the successful completion of the project. <br /> The personnel assigned to the project were competent, knowledgeable, professional and accesible. They were responsinve and providedtimely guidance throughout the project. <br />Based on our experience, we would not hesitate to consider their services again. <br />The Firm demonstrated commintment to the project. They devote the necessary time, attention and personnel to successsfully finish the work.They were engaged throughout the project to address any issues and obtain the desired obectives. <br />The Firm performed the the services in accordance to the agreement and provided their reports and documentation in a timely manner. Their communication was was thorough and provided the information necessary to to monitor the project's progress and make informed decisions. <br />We were pleased with the Firm's overall performance, professionalism and commitment to the project. They were a valuable partner throughout the process and we appreciate the quality and expertise they provided. <br />Daniel Collot LCAM <br />8/11/2026 <br />a
The URL can be used to link to this page
Your browser does not support the video tag.