My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Cummins Cederberg Bid Document (14)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Cummins Cederberg
>
Cummins Cederberg Bid Document (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:04:38 PM
Creation date
8/31/2026 1:03:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scope: <br />• FEMA grant coordination and <br />application <br />• Beach design <br />• Construction Administrator <br />• Drone pre- and post-surveys <br />Contact Information: <br />Bal Harbour Village <br />Julio E. Magrisso <br />655 96th St, <br />Bal Harbour, FL 33154 <br />305-993-7436 <br />Cummins Cederberg designed and permitted an emergency beach nourishment <br />project to partially restore the beach for Bal Harbour Village until a larger project <br />by the USACE could be implemented. <br />The beach and dunes had experienced significant erosion following Hurricane <br />Irma and had been awarded a grant from FEMA for beach restoration. Cummins <br />Cederberg assisted the Village in administering the FEMA grant. Our assistance <br />included compiling and filing the quarterly reports, submitting documentation of <br />completed work, coordination with the grant manager at FDEP, and facilitating <br />a post-construction grant audit by FEMA. Cummins Cederberg also assisted <br />the Village in requesting a time extension under the assumption that the sand <br />placement work would be completed by December 2020 due to turtle season <br />construction restrictions. <br />Construction drawings were prepared for the sand placement and construction <br />methodology was coordinated with the contractor. Cummins Cederberg provided <br />construction administration services for the Village to manage construction. <br />Drone aerial photographs were collected during construction to document <br />progress efficiently. <br />Cummins Cederberg provides ongoing support with the Village’s coastal <br />management program through a continuing services contract. <br />Dune Nourishment <br />Bal Harbour Village, Florida
The URL can be used to link to this page
Your browser does not support the video tag.