Laserfiche WebLink
Scope: <br />• FEMA grant coordination and <br />application <br />• Beach design <br />• Construction Administrator <br />• Drone pre- and post-surveys <br />Contact Information: <br />Bal Harbour Village <br />Julio E. Magrisso <br />655 96th St, <br />Bal Harbour, FL 33154 <br />305-993-7436 <br />Cummins Cederberg designed and permitted an emergency beach nourishment <br />project to partially restore the beach for Bal Harbour Village until a larger project <br />by the USACE could be implemented. <br />The beach and dunes had experienced significant erosion following Hurricane <br />Irma and had been awarded a grant from FEMA for beach restoration. Cummins <br />Cederberg assisted the Village in administering the FEMA grant. Our assistance <br />included compiling and filing the quarterly reports, submitting documentation of <br />completed work, coordination with the grant manager at FDEP, and facilitating <br />a post-construction grant audit by FEMA. Cummins Cederberg also assisted <br />the Village in requesting a time extension under the assumption that the sand <br />placement work would be completed by December 2020 due to turtle season <br />construction restrictions. <br />Construction drawings were prepared for the sand placement and construction <br />methodology was coordinated with the contractor. Cummins Cederberg provided <br />construction administration services for the Village to manage construction. <br />Drone aerial photographs were collected during construction to document <br />progress efficiently. <br />Cummins Cederberg provides ongoing support with the Village’s coastal <br />management program through a continuing services contract. <br />Dune Nourishment <br />Bal Harbour Village, Florida