My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Curtis + Rogers Design Studio, Inc. Bid Document (10)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Curtis + Rogers Design Studio, Inc
>
Curtis + Rogers Design Studio, Inc. Bid Document (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:05:56 PM
Creation date
8/31/2026 1:04:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Services: <br />References: <br />Start Date: <br />Completion Date: <br />Project Budget: <br />C+R Contract Fees: <br />Margaret Pace ParkCity of Miami, FL <br />Curtis + Rogers Design Studio developed a <br />comprehensive master plan for Margaret Pace Park, <br />a key waterfront open space in Miami’s Edgewater <br />neighborhood and an important connection to <br />Biscayne Bay. The phased plan establishes a long- <br />term vision for the park’s renewal, balancing <br />recreation, public access, and ecological resilience. <br /> <br />Addressing challenges such as tidal flooding, shoreline <br />erosion, and limited tree canopy, the master plan <br />incorporates shoreline enhancements, baywalk <br />improvements, native planting, expanded shade, green <br />infrastructure, and upgraded recreational amenities. <br />Implementation begins along the waterfront and will <br />continue through future phases, creating a more resilient, <br />accessible, and climate-ready public park. <br />Reimagining a vital waterfront park through ecological <br />restoration and climate adaptation. <br />Master Planning <br />Waterfront Park Design <br />Coastal Resilience <br />Shoreline Stabilization <br />Nature-Based Solutions <br />Jorge Zurita <br />Project Manager <br />City of Miami <br />305 416 1022 <br />jzurita@miamigov.com <br />June, 2025 <br />TBD <br />$27,645,135.08 <br />$5,299,921.20
The URL can be used to link to this page
Your browser does not support the video tag.