My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Curtis + Rogers Design Studio, Inc. Bid Document (10)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Curtis + Rogers Design Studio, Inc
>
Curtis + Rogers Design Studio, Inc. Bid Document (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:05:56 PM
Creation date
8/31/2026 1:04:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and construction administration personnel are engaged at the appropriate times to <br />deliver beautiful, resilient, and maintainable projects that are within the City’s budget <br />and timeline. At the outset of each task, we will collaborate with City staff to establish <br />project objectives, scope, schedule, budget, and key deliverables. At each initial project <br />kick-off meeting, the project scope, schedule and personnel role are established. <br />Following this meeting, a series of coordination meetings or conference calls- with the <br />client- are established to review the work in progress, and to ensure that the project is <br />proceeding according to the scope, desires of the client group and in accordance with <br />the established schedule. Meeting notes are taken and distributed to all project <br />participants, via email. <br /> <br />Our team structure combined with heavily involved principals provides a distinct <br />advantage in managing scheduling challenges. In our project the USACE Back Bay <br />Study, the involvement of the project manager and availability to step in during last <br />minute meetings gave the opportunity to provide much needed insight to the United <br />States Army Corps of Engineers team on the role of landscape architects in designing for <br />resiliency through green infrastructure. To ensure successful project execution, our Project <br />manager maintains regular communication with City staff through progress meetings, <br />status reports, and timely responses to requests. Rather than relying on multiple layers of <br />management, our managing principal remains closely connected to every project and <br />is available to step in when construction issues arise or community stakeholders need <br />direct engagement. An example of this is with Morningside Park a project in collaboration <br />with the City of Miami where we are co-prime consultants. The immediate access to <br />senior leadership has been able to accelerate problem-solving, improve coordination <br />among project partners, and help prevent minor issues from becoming schedule- <br />impacting delays. For this project the design called for large plant material with character <br />to offer immediate shade upon the park re-opening. When the landscape contractor <br />was running into issues sourcing the material at the specified size and quality, quick <br />coordination from the project manager meeting to review the submitted material <br />allowed for quick decision making to reject the material and to have our team arborist <br />step in to assist with sourcing the material to meet the design intent. The overall result of <br />our management structure has been a more responsive project team, faster decision- <br />making, and greater confidence for clients and stakeholders alike. <br /> <br /> <br />In addition, the Curtis + Roger’s project manager will organize the work into a series of <br />critical tasks. These tasks are evaluated as to the level of effort required, the available <br />data and the anticipated scheduling impacts. This work effort is distributed to all team <br />members, and tracked periodically – with completion dates, anticipated delays or <br />additional tasks needed. The project manager will continually update the task list and <br />track the scope and schedule modifications. Our project Miami Beach Promenade <br />Feasibility Study & Masterplan in collaboration with the City of Miami Beach, a project <br />which we are the prime consultant on, our task tracking allowed the submission of key <br />project deliverables to be submitted ahead of schedule which allowed the City more <br />time for internal review and additional public engagement efforts. Consequently, when <br />additional meetings were requested for public engagement and presentation to City <br />commission, the time saved from earlier phases allowed the project to continue in <br />accordance with the original schedule on time and on budget.
The URL can be used to link to this page
Your browser does not support the video tag.