Laserfiche WebLink
RFQ #26-07-01 | 111 <br /> <br /> <br />Ernesto Aloma, P.E. <br />M/E Engineering Principal-in-Charge <br /> 135 Almeria Avenue • Coral Gables, FL 33134 <br />305.446.2788 • erniea@sdmcorp.com <br /> <br />RESUME <br /> <br />Registration/Certification <br />Professional Engineer <br />State of Florida <br />Registration No. 53823 <br />Professional Affiliations <br />Institute of Electrical & Electronic Engineers <br />National Fire Protection Association <br />Education <br />Bachelor of Science in <br />Electrical Engineering <br />Florida International University <br />Firm Name <br />SDM Consulting <br />Engineers, Inc. <br />Consulting Electrical Engineering Design and Construction Management Services Experience for the <br />past 35 years on a multitude of projects with municipalities such as Miami-Dade County, the City of <br />Miami, the City of Coral Gables, and Miami International Airport to name a few. <br /> <br /> <br />Mr. Aloma is the Principal Engineer responsible for <br />ensuring the utmost level of quality for the various <br />mechanical and electrical engineering design components <br />of all projects. <br /> <br />GGeenneerraall MMEEPP EEnnggiinneeeerriinngg && DDeessiiggnn SSeerrvviicceess ffoorr MMDDAADD <br />Miami International Airport - Miami, Florida <br />PPrriinncciippaall –– MM//EE EEnnggiinneeeerriinngg PPrroojjeecctt MMaannaaggeerr <br />Renovations and improvements of mechanical, electrical, <br />plumbing and fire suppression systems at all MDAD Facilities. <br />Inclusive of multiple projects and specialties such as paging <br />systems, as well as evaluations of air conditioning mechanical <br />rooms at MIA. <br /> <br />CCiittyy ooff CCoorraall GGaabblleess CCoonnttiinnuuiinngg AA//EE DDeessiiggnn SSeerrvviicceess <br />VVeenneettiiaann PPooooll CCoonncceessssiioonn AArreeaa RReennoovvaattiioonn && PPooooll <br />Coral Gables, Florida <br />PPrriinncciippaall EElleeccttrriiccaall EEnnggiinneeeerr <br />Renovation of the Concessions building and assessment of the <br />pool grounding system. <br /> <br />MMiiaammii DDaaddee CCoolllleeggee PPrrooffeessssiioonnaall EEnnggiinneeeerriinngg SSeerrvviicceess <br />Miami, Florida <br />PPrriinncciippaall EElleeccttrriiccaall EEnnggiinneeeerr <br />The provision of construction documents and drawings on <br />various projects throughout the campuses of the College on an <br />as-needed basis. <br /> <br />VViillllaaggee ooff PPiinneeccrreesstt <br />CCoorraall PPiinnee PPaarrkk TTeennnniiss CCeenntteerr aanndd PPllaayyggrroouunndd <br />Pinecrest, Florida <br />PPrriinncciippaall ––EElleeccttrriiccaall EEnnggiinneeeerr <br />An active 9-acre park with a recreation center, inclusive of an <br />interior lobby, entrance tower, concession area, restrooms, <br />and an exterior colonnade. The project scope also includes <br />six lighted tennis courts, a natural area, an all-purpose field, <br />and a covered playground. <br /> <br /> <br /> <br /> <br />CCiittyy ooff MMiiaammii <br />EEsstthheerr MMaaee AArrmmbbrriisstteerr PPaarrkk CCoommmmuunniittyy CCeenntteerr <br />Miami, Florida <br />PPrriinncciippaall –– MM//EE EEnnggiinneeeerriinngg PPrroojjeecctt MMaannaaggeerr <br />Demolition of the existing facility and design of a new facility <br />with an outdoor pavilion in preparation of anticipated <br />construction. <br /> <br />CCiittyy ooff MMiirraammaarr <br />VViizzccaayyaa PPaarrkk CCoommmmuunniittyy CCeenntteerr ((LLEEEEDD GGoolldd)) <br />Miramar, Florida <br />PPrriinncciippaall EElleeccttrriiccaall EEnnggiinneeeerr <br />A 7,660 gsf single story Community Center building. This <br />facility includes spaces for recreation, computer education/ <br />activity, gaming, park concessions, an office, and other <br />support functions. <br /> <br />CCoouunnttrryy CClluubb ooff MMiiaammii –– CCoommmmuunniittyy && AAqquuaattiicc CCeenntteerr <br />Miami, Florida <br />PPrriinncciippaall EElleeccttrriiccaall EEnnggiinneeeerr <br />A new 7,300 gsf, 1-story Community Center, developed on the <br />surrounding site as a Public Park. The building includes a <br />Community Center and pool/restroom facilities; the Aquatic <br />Center consists of two (2) public swimming pools, and several <br />acres of open landscaping and parking lot. <br /> <br />CCiittyy ooff MMiiaammii BBeeaacchh –– CCoolllliinnss PPaarrkk CCuullttuurraall CCaammppuuss <br />Miami Beach, Florida <br />PPrriinncciippaall EElleeccttrriiccaall EEnnggiinneeeerr <br />The restoration of the 'Rotunda' building (a 1960's vintage <br />building); renovation of the existing parking lot to include new <br />landscaping, irrigation, and parking lot improvements; as well <br />as streetscape lighting. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />