Laserfiche WebLink
RFQ #26-07-01 | 18 <br />RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING <br />SERVICES (CCNA) <br />Page 41 <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net |Purchasing@sibfl.net <br />REFERENCE QUESTIONNAIRE <br />It is the responsibility of the proposer to provide a minimum of three (3) different references other than City <br />of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so <br />may result in the rejection of your submission. <br />Giving reference for: (Firm) _______________________________________________________________ <br />Firm giving Reference: ____________________________________ _______________________________ <br />Phone: ____________________________________________ <br />Email: ___________________________________________ <br />1.Q: <br />A: <br />2.Q: Rate the competence and accessibility of the personnel directing, supervising and <br />performing the work on your project. <br />A: <br />3.Q: Would you use them again? <br />A: <br />4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel <br />necessary to successfully complete your project? <br />A: <br />5.Q: <br />and content? <br />A: <br />6.Q: Is there anything else we should know, that we have not asked? <br />A: <br />The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and <br />are made independently, free from vendor interference/collusion. <br />Name: _______________________________________ Title _____________________________________________ <br />Sign Name: __________________________________ Date: ___________________________________________ <br />EAC Consulting, Inc <br />City of West Palm Beach <br />561-494-1111 <br />Rerysthee@wpb.org <br />High <br />High <br />Yes <br />High. Yes, EAC did devote the time and personel necessary to successfully complete my project. <br />High <br />EAC has performed outstandingly as a civil engineering firm. <br />8/12/26 <br />Engineering Services Project ManagerRandy Erysthee, P.E.