My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc. Bid Document (6)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
EAC Consulting, Inc
>
EAC Consulting, Inc. Bid Document (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:07:57 PM
Creation date
8/31/2026 1:05:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ #26-07-01 | 45 <br />PortMiami North Cruise Boulevard <br />Extension Phase IIB Roadway <br />Improvements and Flyover Bridge <br />Miami, FL — Miami-Dade County <br />Project Description: <br />The project consisted of a Roadway and <br />Bridge “Fly Over” Structure improvements <br />to alleviate adverse traffic flow conditions <br />for PortMiami’s current and future <br />Cruise Terminal development program. <br />The scope of work included roadway <br />horizontal and vertical alignment, typical <br />sections, drainage design, bridge design, <br />miscellaneous structural design, lighting, <br />signing and pavement markings, utilities <br />coordination and maintenance of traffic. <br />Contact: <br />1080 Caribbean Way, Suite 500 <br />Miami, FL, 33132 <br />Victor Gutierrez, PE, PMP <br />305-347-4802 <br />HardRock Stadium Pedestrian <br />Bridges <br />Miami Gardens, FL — Miami-Dade <br />County <br />Project Description: <br />EAC completed the design of two <br />pedestrian bridge substructures, which <br />facilitate access to and from the Hard <br />Rock Stadium. Both bridges are 14-ft wide. <br />One spans 151-ft 11-in, and crosses over <br />NW 199th Street on the south side of the <br />stadium. The other spans 206-ft 11-in, <br />and crosses over the Turnpike Access <br />Road on the east side. Construction on <br />this fast-track Design-Build project began <br />in January 2019 and was completed in <br />January 2020, prior to SuperBowl LIV. <br />Contact: <br />1050 NW 163rd Drive <br />Miami Gardens, FL 33169 <br />Les Pettit <br />305-622-8000
The URL can be used to link to this page
Your browser does not support the video tag.