Laserfiche WebLink
RFQ #26-07-01 | 45 <br />PortMiami North Cruise Boulevard <br />Extension Phase IIB Roadway <br />Improvements and Flyover Bridge <br />Miami, FL — Miami-Dade County <br />Project Description: <br />The project consisted of a Roadway and <br />Bridge “Fly Over” Structure improvements <br />to alleviate adverse traffic flow conditions <br />for PortMiami’s current and future <br />Cruise Terminal development program. <br />The scope of work included roadway <br />horizontal and vertical alignment, typical <br />sections, drainage design, bridge design, <br />miscellaneous structural design, lighting, <br />signing and pavement markings, utilities <br />coordination and maintenance of traffic. <br />Contact: <br />1080 Caribbean Way, Suite 500 <br />Miami, FL, 33132 <br />Victor Gutierrez, PE, PMP <br />305-347-4802 <br />HardRock Stadium Pedestrian <br />Bridges <br />Miami Gardens, FL — Miami-Dade <br />County <br />Project Description: <br />EAC completed the design of two <br />pedestrian bridge substructures, which <br />facilitate access to and from the Hard <br />Rock Stadium. Both bridges are 14-ft wide. <br />One spans 151-ft 11-in, and crosses over <br />NW 199th Street on the south side of the <br />stadium. The other spans 206-ft 11-in, <br />and crosses over the Turnpike Access <br />Road on the east side. Construction on <br />this fast-track Design-Build project began <br />in January 2019 and was completed in <br />January 2020, prior to SuperBowl LIV. <br />Contact: <br />1050 NW 163rd Drive <br />Miami Gardens, FL 33169 <br />Les Pettit <br />305-622-8000