Laserfiche WebLink
RFQ #26-07-01 | 47 <br />City of Opa-locka Stormwater <br />Master Plan <br />Opa-locka, FL — Miami-Dade County <br />Project Description: <br />EAC developed master plans for its water, <br />sewer, stormwater and roadway systems <br />in order to create a comprehensive <br />Capital Improvement Project (CIP) Master <br />Plan with a minimum 10-year projectionto <br />ensure that the city’s infrastructure will <br />meet the current and projected needs <br />while maintaining compliance with <br />applicable jurisdictional standards and <br />requirements. <br />Contact: <br />City of Opa-Locka <br />Public Works & Utilities Office <br />12950 Lejeune Road, 2nd Floor <br />Opa-locka, FL 33054 <br />Airia Austin <br />305-953-2868 Ext 1450 <br />City of South Miami Progress Road <br />South Miami, FL — Miami-Dade <br />County <br />Project Description: <br />EAC was tasked with addressing the <br />severe flooding that occurred within <br />Progress Road in South Miami. The slab- <br />covered trenches were fill and abandoned <br />per local regulatory requirements and <br />150LF of new exfiltration trench and <br />storm water inlets were constructed. The <br />improvements also included full milling <br />and resurfacing and new signage and <br />pavement markings. <br />Contact: <br />City of South Miami, FL <br />4795 SW 75th Ave, <br />Miami, FL 33155 <br />Alex Munoz <br />305-403-2063