My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EAC Consulting, Inc. Bid Document (6)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
EAC Consulting, Inc
>
EAC Consulting, Inc. Bid Document (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:07:57 PM
Creation date
8/31/2026 1:05:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFQ #26-07-01 | 52 <br />South Miami Park - New Restroom <br />Building Improvements <br />South Miami, FL — Miami-Dade <br />County <br />Project Description: <br />The project consisted of a new restroom <br />and concession building within the South <br />Miami Park. The project also included a <br />grinder pump lift station and a new 8-inch <br />watermain extension along SW 45th <br />Street (approximately 80 feet west) to SW <br />58th Avenue and along SW 58th Avenue <br />from SW 45th Street to the South Miami <br />Park property and within the property. <br />EAC’s scope of work included project <br />management, design, permitting, bid and <br />construction administration services. <br />Contact: <br />City of South Miami <br />5800 SW 66th St, South Miami, FL 33143 <br />John Tyson <br />305-668-3863 <br />Greynolds Park Rehabilitation and <br />Improvements <br />Miami Gardens, FL — Miami-Dade <br />County <br />Project Description: <br />The project to restore the park involved <br />repairs to the existing Historic Pedestrian <br />footbridges and culverts, and restoration <br />of water flow at the rockery. Park <br />improvements included renovation of the <br />historic incinerator, historic rock walls <br />and historic rock picnic seating areas <br />and steps. The project also involved <br />beautification of Miami Gardens Drive, <br />the introduction of new toll guard booths, <br />additions to pedestrian walkways and <br />interior and exterior renovations at the <br />Maintenance Yard Building. <br />Contact: <br />Miami-Dade County PROS <br />275 NW 2nd Street, Miami, FL 33128 <br />Adelfa Martinez, LEED AP <br />305- 755-7995
The URL can be used to link to this page
Your browser does not support the video tag.