My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Edgewater Group Bid Document (39)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Edgewater Group
>
Edgewater Group Bid Document (39)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:12:24 PM
Creation date
8/31/2026 1:11:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Riviera Beach Qualifications for Marine/Marina Consulting Services 20 <br />5. References <br />39RFQ #26-07-01 Edgewater Group <br />City of <br />Apalachicola <br />Ongoing Services <br />Client Name: City of ApalachicolaClient Address: 1 Bay Avenue, Apalachicola, FL 32320Contact Phone: (479) 402-0070Contact Email: lglaze@cityofapalachicola.comDate Project Began: Q2 2024Completion Date: As-Needed Basis <br />Reference Project #1 <br />Since 2024, Edgewater Group has provided continuing environmental and coastal engineering services to the City of Apalachicola, supporting waterfront restoration, park improvements, and resiliency initiatives. <br />Ongoing projects include the CDBG-DR Riverfront Revitalization Program, the Public Pier and Boardwalk, and Lafayette Park improvements, helping enhance public access while protecting the City’s coastal resources. <br />Scope of Services <br />Edgewater has provided environmental and coastal engineering, waterfront planning and design, environmental permitting, ecological assessments, water quality monitoring, landscape planning, FEMA and regulatory coordination, contractor oversight, and construction support. Services have included the design of boardwalks, docks, retaining walls, and public access improvements, as well as ongoing site assessments and monitoring to support resilient, sustainable waterfront infrastructure. <br />About the Project
The URL can be used to link to this page
Your browser does not support the video tag.