My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HADONNE CORP Bid Document (33)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
HADONNE CORP
>
HADONNE CORP Bid Document (33)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:26:00 PM
Creation date
8/31/2026 1:25:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Relevant project experience <br /> FIU Modesto A. Maidique Campus <br />Campus Surveying, Utility Mapping & Infrastructure Support Services <br />Client Florida International University Location Miami, Florida <br />Dates October 2023 – December 2025 Fee $33,070.00 <br />Performed By Hadonne Corp <br /> <br />Project Snapshot <br />Hadonne Corp supported Florida International University with surveying and underground utility investigation services across athletic areas, parking infrastructure, and <br />water main relocation corridors. The work delivered accurate field data, utility coordination support, and design-ready survey mapping to help FIU advance campus <br />improvements with confidence and reduced risk. <br />Services Provided <br />• Topographic survey of soccer field, running track, parking areas, drainage features, sidewalks, fencing, lighting, and surface improvements. <br />• Water main relocation survey documenting visible utility appurtenances, alignments, control, and accessible infrastructure information. <br />• Underground utility location coordination for water, sewer, storm, electric, telecom, fiber-optic, and gas facilities. <br />• Survey mapping support for grading, drainage evaluation, future design coordination, resurfacing, and campus infrastructure planning. <br />Deliverables <br />• Design-ready CAD files with organized survey, topographic, utility, and control layers. <br />• PDF survey maps for each project area. <br />• Integrated utility information in final topographic base maps. <br />• Control points and benchmark information for future design and construction. <br />Why It Matters <br />Hadonne Impact: Hadonne provided FIU with reliable survey and utility data to support smarter planning, reduce design conflicts, improve coordination, and streamline <br />future campus infrastructure improvements. <br /> <br />16094-CT 4 CDWWTP New Material Building <br />Subsurface Utility Engineering (SUE) for New Materials Management Building FPL Lines <br />Organization/Firm Miami-Dade Water and Sewer Department Contract No. EDP-WS-S-433A <br />Contact Juan C. Cordero, P.S.M., ENV SP, Senior Program Manager Dates 08/07/2025 – 09/2025 <br />Email juan.cordero@miamidade.gov Phone 786-268-5326 <br />Professional Fees $30,343.01 <br /> <br />Project Snapshot <br />Hadonne Corp provided Subsurface Utility Engineering (SUE) services for the CDWWTP New Material Building project, supporting Miami-Dade Water and Sewer <br />Department with accurate field investigation and utility exposure for portions of the New Materials Management Building FPL lines. The work helped identify existing <br />utility conditions and reduce potential conflicts during design and construction coordination. <br />Services Provided <br />• Performed Subsurface Utility Engineering (SUE) to accurately locate existing utilities within the project area. <br />• Exposed existing utilities for portions of the New Materials Management Building FPL lines. <br />• Supported design and construction coordination by identifying utility locations and potential conflicts. <br />7
The URL can be used to link to this page
Your browser does not support the video tag.