Laserfiche WebLink
City of Sunny Isles Beach | RFQ # 26-07-01 <br />CAPACITY, AVAILABILITY & RESPONSIVENESS <br />Successful continuing-services contracts require more than technical expertise. Municipal clients depend upon <br />immediate responsiveness, accessible project leadership, and the ability to efficiently support multiple concurrent task <br />authorizations. KEITH’s organizational structure is specifically designed to provide these advantages while maintaining <br />consistent project oversight, accountability, and client service. <br />With more than 200 professionals located across five Florida offices, KEITH maintains the depth of staff necessary <br />to support ongoing assignments while continuing to provide responsive service to existing municipal clients. Our <br />integrated practice lines allow resources to be assigned quickly based on project-specific needs without impacting <br />delivery schedules or service commitments. This flexibility enables our team to efficiently support multiple concurrent <br />task authorizations while maintaining quality, responsiveness, schedule adherence, and continuity of service. <br />KEITH actively manages continuing-services assignments throughout Florida using a resource allocation model that <br />balances staff availability, project demands, and client priorities. This approach allows our team to maintain adequate <br />capacity for both routine assignments and time-sensitive municipal initiatives while ensuring project schedules, quality <br />standards, responsiveness commitments, and client expectations are consistently achieved. <br />For the City of Sunny Isles Beach, KEITH has assembled a dedicated multidisciplinary team ssupported by in-house <br />general civil engineering, landscape architecture, transportation / transit / traffic engineering, survey and mapping, <br />planning, construction management, CEI, and subsurface utility engineering professionals. This integrated structure <br />allows resources to be scaled as project demands evolve, ensuring qualified staff remain available throughout the <br />duration of each assignment while maintaining a single point of accountability for the City. <br />As a current continuing-services consultant to Sunny Isles Beach, KEITH is already familiar with City <br />standards, procedures, stakeholders, and project delivery expectations. <br />This familiarity allows our team to efficiently mobilize resources, respond quickly to task authorizations, and provide <br />seamless support with minimal startup effort. KEITH maintains a local Miami-Dade office located within 20 miles from <br />Sunny Isles Beach City Hall, providing convenient access for meetings, field reviews, site visits, coordination efforts, and <br />project support throughout the term of the contract. <br />Supported by more than 75 continuing-services contracts statewide and over 168 projects completed within Miami- <br />Dade County, KEITH has developed proven procedures for managing task-order-based assignments while maintaining <br />responsiveness, quality, schedule adherence, and client satisfaction. <br />PROPOSED PROJECT DELIVERY STRUCTURE <br />ROLE RESPONSIBILITY <br />Principal-in-Charge Executive oversight, strategic guidance, and resource commitment <br />Client Service Manager Contract performance, client coordination, and responsiveness <br />Project Manager Daily project management, task authorization execution, and project delivery <br />Deputy Project Manager Schedule coordination, project support, and resource management <br />QA/QC Officer Independent technical review and quality assurance oversight <br />Discipline Leads Technical delivery, design coordination, and execution of assigned tasks <br />Engineering Inspired Design.23CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 3 | STAFFING