My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moffatt & Nichol Bid Document (5)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Moffatt & Nichol
>
Moffatt & Nichol Bid Document (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:33:54 PM
Creation date
8/31/2026 1:32:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALIFICAtIoNS 60P261925RFQ # 26-07-01 • CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />Project (Client) <br />Hammock Beach Resort Hotel Coastal Permitting (KDG Capital) <br />National Hotel FDEP CCCL Permitting (New National Hotel) <br />Shipyards Bulkhead and Marina Design-Build (Hal Jones Contractor) <br />Port Everglades Bond Engineering (Broward County - Port Everglades Department) <br />Castle Beach Club Coastal Permitting (Terra Group) <br />SR 5 (US 17) Trout River to SR 104 (Chen Moore & Associates) <br />FDOT D6 Traffic Operations Studies Consultant (Choice Engineering) <br />National Park Service Castillo de San Marcos Seawall Repair (Croft and Associates, PC) <br />Henderson Beach Resort Code Compliance Review (KB RC Club Owner) <br />Carpenter Creek Restoration (Pensacola & Perdido Bays Estuary Program) <br />Grand Reserve Hyatt Puerto Rico (Coco Beach Golf) <br />Terminal Island Marina Redevelopment (One Island Park - Lincoln Park Company) <br />Miami Beach Digital Kiosks Permitting (IKE Smart City) <br />Marriott Water Street Marina Planning Study (Marriott International) <br />Garcon Point Development (Garcon Point Partners) <br />Waldorf Astoria (1350 Pompano Developer, LP) <br />Chumuckla Highway PD&E Study (Volkert, Inc) <br />Deauville Redevelopment Permitting and Flood Consulting Services (Terra Group) <br />St. Lucie County Harbour Pointe Boat Ramp and Civil Infrastructure (CPZ Architects) <br />Pride Hollywood Beach Coastal Consulting (Pride Hollywood Beach) <br />105-115 Ocean Blvd. Residence (BIG Architecture DPC) <br />EcoResiliency Miami (Jungle Island) (EcoResiliency Miami) <br />Monument Island Restoration Design and Permitting (City of Miami Beach) <br />Coast to Coast Trail - Post Design (FDOT - District 5) <br />Grant Management -Community Development Block Grant -Mitigation Funding (CDBG-MIT) (BDO Government Services) <br />Replace Waterfront Transformers and Igloos Design-Build (Miller Electric Company) <br />1136 Holiday Drive - FTL Beach Project Permitting (1140 Las Olas) <br />Marine Patrol Docks at Maurice Gibb Park (City of Miami Beach) <br />Playa Punta Espada Golf Club (MINIARI SAS) <br />National Park Service Gulf Islands National Seashore 277211 Rehabilitation of Okaloosa Unit Recreational Facilities (Croft and Associates, PC) <br />Ritz-Carlton Bal Harbour Renovation (Beilinson Gomez Architects P.A.) <br />Northern Flagler County Beach Nourishment (Flagler County) <br />Seaport Manatee Container Yard Expansion Phase 3 (Stantec) <br />101 Ocean Blvd. (101 Ocean Blvd.) <br />Grand Bay Beach Club (KB RC Club Owner) <br />El Prado Park Project (Hitchcock Design Group) <br />Crystal Beach Hotel (BHK Crystal Beach) <br />Hyatt Sarasota (KT Sarasota JV Northeast) <br />Boca Villas Project (Boca Villas Owner) <br />Tampa Bay Coastal Master Plan (Tampa Bay Regional Planning Council)
The URL can be used to link to this page
Your browser does not support the video tag.