My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Moffatt & Nichol Bid Document (5)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Moffatt & Nichol
>
Moffatt & Nichol Bid Document (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:33:54 PM
Creation date
8/31/2026 1:32:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALIFICAtIoNS 63P261925RFQ # 26-07-01 • CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />Project (Client) <br />City of Fernandina Beach Harbor Master Plan (City of Fernandina Beach) <br />TRF Cathodic Protection Replacement (MN-BMCD SE JV) <br />P046U Shoreline Stabilization Area 4 (MN-BMCD SE JV) <br />Northern Flagler County FEMA Dune Design and CEI (Flagler County) <br />Zoning Services - Vantix (Port Tampa Bay) <br />Dredging and Permitting Services (Port Tampa Bay) <br />Berth 219 Outfall Relocation Final Design & Permitting (Port Tampa Bay) <br />Surveying & SUE Services - Colliers (Port Tampa Bay) <br />SurvTech Hurricane Practice Survey (Port Tampa Bay) <br />CT6 CA Support (Port Tampa Bay) <br />Berth 302 Equip/Convey Storage Area (Port Tampa Bay) <br />214 Crane Stop Redesign (Port Tampa Bay) <br />Tariff Consulting - C3 Associates (Port Tampa Bay) <br />Berth 213 Electrical CA - Hall Engineering (Port Tampa Bay) <br />STS Crane Drawing Review (Port Tampa Bay) <br />STS Crane FAT and Commissioning (Port Tampa Bay) <br />SurvTech Lidar at CT2 (Port Tampa Bay) <br />FDOT D3 GEC 2025 (FDOT - District 3) <br />Town of Palm Beach - Bradley Park Bulkhead Condition Assessment (Town of Palm Beach) <br />FIT Densification Phase II - Tasks 1 & 2 (Florida International Terminals) <br />Isle of Tampa Bay - Wave and Storm Surge Impact Assessment (Georgetown (Tampa) ASLI VI, LLLP) <br />RMK Merrill Stevens South Yard (RMK Merrill Stevens) <br />NFE - Temporary Power - San Juan (NFE Management) <br />Widen Turnpike Mainline - Neptune Road PDS (Florida's Turnpike Enterprise) <br />Widen Turnpike Mainline (Florida's Turnpike Enterprise) <br />Westshore Marina District - Final Design (New Port Tampa CDD Holdings) <br />Playa Sotogrande (CivilCap Desarrollos y Construcciones SRL) <br />Hollywood Flower Street Ends Permitting (City of Hollywood - Beach CRA) <br />Project Ray (Confidential) <br />Keating Park CCCL Permitting (City of Hollywood - Beach CRA) <br />Hollywood Flower Street Civil (City of Hollywood - Beach CRA) <br />Ocean Terrace Sales Center (Ocean Terrace Holdings) <br />Ocean Terrace Streetscape (OTH Streetscape)
The URL can be used to link to this page
Your browser does not support the video tag.