My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Premiere Design Solutions, Inc. Bid Document (26)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Premiere Design Solutions, Inc
>
Premiere Design Solutions, Inc. Bid Document (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:34:48 PM
Creation date
8/31/2026 1:33:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Qualifications <br />Florida Department of Transportation <br />RON DESANTIS <br />GOVERNOR 605 Suwannee Street <br />Tallahassee, FL 32399-0450 <br />JARED W. PERDUE, P.E. <br />SECRETARY <br />1 <br />June 30, 2026 <br />Luis Jurado, President <br />PREMIERE DESIGN SOLUTIONS, INC. <br />2665 Executive Park Dr. <br />Suite 1 <br />Weston, FL 33331 <br />pds@pds-eng.com <br />Dear Mr. Jurado: <br />The Florida Department of Transportation has reviewed your application for prequalification <br />package and determined that the data submitted is adequate to technically prequalify your firm <br />for the following professional services types of work per Rule 14-75, F.A.C.: <br />3.1 - Minor Highway Design <br />3.2 -Major Highway Design <br />7.1 - Signing, Pavement Marking and Channelization <br />7.2 -Lighting <br />7.3 -Signalization <br />8.1 - Control Surveying <br />8.2 -Design,Right of Way &Construction Surveying <br />8.4 - Right of Way Mapping <br />10.1 -Roadway Construction Engineering Inspection <br />13.5 - Subarea/Corridor Planning <br />13.6 -Land Planning/Engineering <br />Your firm is now technically prequalified with the Department for Professional Services in the <br />above referenced work types. The overhead audit has been accepted, and your firm may pursue <br />projects in the referenced work types with fees of any dollar amount. This status shall be valid <br />until June 30, 2027, for contracting purposes. <br />19
The URL can be used to link to this page
Your browser does not support the video tag.