My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.E. Chisholm Architects. Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
R.E. Chisholm Architects. Inc
>
R.E. Chisholm Architects. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:36:37 PM
Creation date
8/31/2026 1:34:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORKLOAD & AVAILABILITY <br />Chisholm Architects and all Key personnel are readily available and are currently staffed to meet the future project needs of <br />the City of Sunny Isles Beach. Our team is capable to perform any additional work associated with a contract resulting from <br />this RFQ within the required time frame. <br />CURRENT AND PROJECTED WORKLOAD CURRENT PHASE PROJECTED START <br />OR COMPLETION <br />DESIGN <br />ADOM Scared Heart <br />Institutional Design Development Construction Start: TBD <br />City of Riviera Beach Public Works Building Renovation <br />Corporate Design Development Construction Start: TBD <br />MD-PROS Kayak Launch (Multiple Locations) <br />Parks and Recreation Schematic Design Construction Start: TBD <br />Renaissance Hall at Old Golf Course | Phase II <br />Residential Community Schematic Design Construction Start: TBD <br />STOF Seminole Townhomes <br />Residential Community Schematic Design Construction Start: TBD <br />Lummus Park Community Center <br />Recreation Construction Documents Construction Start: TBD <br />Brodie Residence <br />Residential Construction Documents Construction Start: TBD <br />MDCPS Pinecrest Elementary School <br />Institutional Construction Documents Construction Start: TBD <br />PERMITTING <br />VOBP Biscayne Park Historic Log Cabin <br />Historic Preservation / Institutional Pre-Construction Construction Start <br />December 2026 <br />CONSTRUCTION <br />Renaissance Hall at Old Golf Course <br />Residential Community Construction Construction Start / Finish <br />October 2024 – August 2026 <br />MDCPS Chapman House Historic Renovation <br />Historic Preservation / Institutional Construction Construction Start <br />November 2025 <br />UPCOMING <br />Brightline – (2) Commuter Rail Stations <br />Transit ON HOLD TBD <br />OW Apartments <br />Housing ON HOLD TBD <br />CITY OF SUNNY ISLES BEACH <br />CONTINUING PROFESSIONAL ARCHITECTURAL AND <br />ENGINEERING CONSULTING SERVICES (CCNA) <br />RFQ NO. 26-07-01 <br />113
The URL can be used to link to this page
Your browser does not support the video tag.