52
<br />City of Sunny Isles Beach | RFQ 26-07-01
<br />Continuing Professional Architectural and Engineering | General Civil Engineer
<br />Current Workload
<br />Ross Engineering, Inc. has reviewed its recent and current workload and confirms that the firm has
<br />adequate staff capacity to support the City of Sunny Isles. The following workload chart identifies Ross
<br />Engineering’s current and recently completed projects, including the services provided, total fees, current
<br />project phase or completion status, manpower allocation, estimated duration, and proposed availability.
<br />Projects currently on hold for more than sixty (60) days have not been included in the manpower
<br />projections. The accompanying workload availability chart demonstrates that Ross Engineering maintains
<br />available staffing capacity in all projected quarters. The chart shows the firm’s workload allocation as a
<br />percentage of available capacity, along with the remaining percentage available for new assignments.
<br />As current projects are completed, Ross’ workload decreases, and staff availability increases, allowing the
<br />firm to provide the City of Sunny Isles with timely support for assigned civil engineering task orders.
<br />Project / Client Services Provided Total Fees Construction
<br />Value
<br />Current Phase
<br />or Completed
<br />Estimated
<br />Duration Cumulative Availability for MDC %Currently Under Contract Delivery Method Percent (%) Completion Bonded / Name of
<br />Surety
<br />The School Board of Broward County Civil Engineering
<br />Continuing Contract
<br />Civil site grading and drainage design, permitting and
<br />construction inspection, BODRs, 5 year Drainage Re-
<br />Certifications for various schools
<br />$1,250,000 $15,000,000 70%06/15/2026 -
<br />12/1/2028 Yes Plans, Reports and Engineering
<br />certifications letters 70% (Year 3 of 5YR Contract)N/A
<br />SBBC Stephen Foster Elementary School Watermain
<br />Replacement
<br />Water main Design, permitting and Construction
<br />Inspection $75,000 $1,526,000.00 70%08/10/2025-
<br />12/15/2026
<br />
<br />Yes Design/Bid/Build 75%N/A
<br />Miami-Dade County Thomas Jefferson Middle School Drainage Analysis,Design, permitting and civil
<br />construction admin $95,000 $500,000.00 15%08/30/2025-
<br />12/30/2027
<br />
<br />Yes Design/Bid/Build 100%N/A
<br />MDWASD Small Diameter Pipeline Contract
<br />Water Main Design, permitting and Construction
<br />Inspection; BODR for Water Mains and Septic to
<br />Sewer Conversions (Currently in CM phase)
<br />$3,400,000 $570,000,000.00 85%06/01/2017-
<br />06/01/2027
<br />
<br />Yes Design/Bid/Build 85%N/A
<br />MDCPS-West Brickell Middle School
<br />Water, sewer, Drainage design, new roadway design
<br />along SW 3rd Ave, permitting and Construction
<br />Inspection
<br />$125,000 $35,000,000 90%08/10/2025-
<br />12/15/2026 YES Design/Bid/Build 95%N/A
<br />City of Fort Lauderdale Consultant Services for city-wide
<br />inflow and Infiltration Reduction Program
<br />Sanitary Sewer Evaluation Survey, Inspections, GIS,
<br />Reports and Maps $1,500,000 $50,000,000 75%01/10/2023-
<br />12/15/2026 Yes Design/Bid/Build 95%N/A
<br />City of Miami Gardens Civil-Architecture Continuing
<br />Consulting Contract
<br />Drainage Modeling Analysis, roadway and drainage
<br />design, permitting and civil construction engineering
<br />& inspection
<br />$50,000 $500,000 50%01/10/2023-
<br />12/15/2027 Yes Design/Bid/Build 99%N/A
<br />City of Boca Raton-Continuing A&E Contract
<br />Drainage Modeling Analysis using ICPR (Stormwise)
<br />to support a 100 Acre neighborhood improvement
<br />project with Level of Service D flooding. Assisted with
<br />Permitting with SFWMD and BCEPD
<br />$70,000 $4,500,000 80%06/10/2025-
<br />12/15/2027 Yes Design/Bid/Build 98%N/A
<br />Broward County Water & Wastewater PFAS Removal for
<br />WTP1A and WTP-2A
<br />Drainage Modeling Analysis using ICPR (Stormwise)
<br />to support a 100 Acre neighborhood improvement
<br />project with Level of Service D flooding. Assisted with
<br />Permitting with SFWMD and BCEPD
<br />$70,000 $4,500,000 80%09/01/2025-
<br />01/30/2030 Yes Design/Bid/Build 98%N/A
<br />Total
<br />Availability
<br />Staff
<br />Available
<br />to MDC Staff
<br />Available
<br />to MDC Staff
<br />Available
<br />to MDC Staff
<br />Available
<br />to MDC
<br />Notes Notes Notes Notes Notes Notes
<br />Section 5.2 Recent and Current Workload
<br />The Applicant shall document the extent of its services and total fees (the “Workload”) for projects completed or ongoing within the past ten (10) years. Documentation of all current Workload for projects
<br />shall include (1) current phase of the projects under commission by the Applicant; (2) Applicant’s manpower allocation in response to the current Workload; and (3) the estimated duration of the specified
<br />task. Applicants shall document proposed allocation of manpower in relation to its current Workload relative to this Project. Project(s) currently on hold for a period in excess of 60 days shall not be
<br />included in the manpower projections.
<br />Label this Response to Section 5.2
|