Laserfiche WebLink
54 <br />City of Sunny Isles Beach | RFQ 26-07-01 <br />Continuing Professional Architectural and Engineering | General Civil Engineer <br />Ross Engineering, Inc. has organized this section to respond directly to both the proposal format required <br />by Section 4 of the solicitation and the Approach to Project Management criteria on which this section is <br />scored. The methodology that follows is the same disciplined, earned-value-based project-management <br />system Ross applies on its continuing-services and task-work-order contracts throughout South Florida, <br />scaled to the size, urgency, and risk of each assignment the City of Sunny Isles Beach authorizes. <br />Quick Key to Ross Engineering’s Responses to City’s Requirements <br />Approach/Methodology Where Addressed <br />Suitability of the methodologies and approaches used in <br />achieving tasks <br />4.1 Understanding of the Contract; 4.2 Suitability <br /> of Methodology <br />Overall organization to completing the project 4.3 Project Organization and Accountability <br />Work plan explaining how deadlines will be met 4.4 Task-Order Work Plan <br />Approach to Project Management – Cost Control 4.5.1 Cost Control, Cost Estimating, and Value <br /> Engineering <br />Approach to Project Management – Scheduling 4.5.2 Scheduling and Ability to Meet Deadlines <br />Approach to Project Management – Quality Control / <br />Quality Assurance <br />4.5.3 Quality Control and Quality Assurance <br />Ability to meet desired timelines and deadlines 4.4 Work Plan; 4.5.2 Scheduling <br />Communication with the City’s Project Manager 4.6 Communication and Project Documentation <br />How complaints are handled and brought to the City’s <br />Project Manager <br />4.7 Complaint and Issue Resolution <br />4.1 UNDERSTANDING OF THE CONTRACT <br />Ross Engineering understands that the City of Sunny Isles Beach is establishing an as-needed continuing <br />professional services contract under which assignments may vary in size, urgency, technical complexity, <br />and duration. Some task orders may involve a focused site evaluation, feasibility analysis, plan review, cost <br />estimate, permitting consultation, or technical memorandum. Others may require complete engineering <br />services through survey, investigation, design, permitting, bidding, construction administration, field <br />observation, record drawings, and project closeout. <br />The City’s anticipated General Civil Engineering assignments include roadway and drainage <br />improvements, conversion of stormwater wells to pressurized systems through the addition of pumps, <br />water-distribution and wastewater-collection systems, pump stations, injection wells, pipelines, NPDES <br />permitting, surveying and GIS, feasibility studies, construction documents, cost estimates, bidding <br />assistance, construction administration, inspections, plan review, grant support, and representation of <br />the City before governmental and regulatory agencies. <br />Ross will approach each assignment as an extension of City staff. Our objective is to give the City a responsive <br />local team that understands the assignment, establishes clear expectations before work begins, verifies <br />existing conditions, identifies risks early, and delivers practical solutions within the authorized scope, <br />schedule, and budget. <br />Our methodology rests on six principles: early scope definition, direct senior involvement, field-verified <br />information, proactive schedule and cost control, continuous quality review, and open communication <br />with the City’s Project Manager. These principles have supported Ross’s work under continuing-services <br />and task-order contracts for municipalities, utilities, educational institutions, parks departments, and <br />other South Florida public agencies. <br />4. Approach/Methodology