My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc. Bid Document (4)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
SRS Engineering, Inc
>
SRS Engineering, Inc. Bid Document (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 1:55:30 PM
Creation date
8/31/2026 1:54:31 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. STAFFING <br />51SRS Engineering, Inc.• RFQ No. 26-07-01 <br />3. STAFFING _______________ <br />PERSONNEL ROLE IN THIS <br />CONTRACT <br />Function in the <br />Company License Availability <br />Luis Hurtado Field Engineer / Inspector Construction <br />inspection —30% <br />Misael Garcia, E.I.Design Engineer — Civil Design engineering E.I.20% <br />Dairon Abreu Design Engineer — Civil Design engineering —20% <br />Jose Castro Design Engineer — Civil Design engineering —20% <br />Yuliett Perez Design Engineer — Civil Design engineering —20% <br />Ana Laura Gonzalez Design Engineer — Civil Design engineering —20% <br />Robin Fernandez Design Engineer — Civil Design engineering —20% <br />Christopher Arciniegas Design Engineer — Civil Design engineering —20% <br />Rolando Cue Survey Crew Chief Survey group —20% <br />Sebastian Bautista Survey Crew Survey group —20% <br />Orelvys Yhanes Survey Crew Survey group —20% <br />Heber Bernardez Survey Support Survey group —20% <br />Ralph Pereda Contracts and Invoicing Office Administrator <br />/ Contracts Specialist —As needed <br />Nicole Mercadal Proposal and Submittal <br />Coordination Marketing Director —As needed <br />HOW THE PROJECT MANAGER WILL ALLOCATE TIME AND RESOURCES <br />Mr. Martinez will dedicate an initial 30 percent of his time to this contract and will function as the City’s single <br />day-to-day point of contact. His role is to triage every City request by urgency, discipline and required response; <br />to confirm scope, deliverables, schedule and fee before work begins; and to keep the City informed of status <br />without the City having to ask. He has extensive municipal and project management experience across roadway <br />improvements, drainage systems, site development, pump stations, pipelines, water and sewer systems and <br />construction management. Field reviews, preliminary opinions, plan reviews, cost estimates, meeting attendance, <br />drainage or utility observations — are handled directly by Mr. Martinez with a project engineer and support staff. <br />Larger assignments are staffed with a project manager, design engineer, CADD support, surveyor, field inspector, <br />cost estimator and specialty sub-consultants. Mr. Martinez reviews current workload before accepting each <br />assignment so the schedule committed to the City is achievable, and he escalates to Mr. Serralta on any matter <br />involving scope change, fee, risk or a decision the City needs to make. Availability percentages shown above are <br />initial allocations. SRS commits to increasing allocation as City workload requires, and the depth of the 30-person <br />staff pool means additional engineers, inspectors and survey crews can be assigned without displacing committed <br />work.
The URL can be used to link to this page
Your browser does not support the video tag.