My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
THE ENGINEERING COMPANY Bid Document (24)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
THE ENGINEERING COMPANY
>
THE ENGINEERING COMPANY Bid Document (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:21:24 PM
Creation date
8/31/2026 3:20:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINIMUM QUALIFICATION REQUIREMENTS — COMPLIANCE SUMMARY <br />The RFQ (Section 2.4, as amended by Addenda Nos. 2, 4, 6, and 7) establishes three pass/fail Minimum Qualification <br />Requirements. TEC satisfies each. The table below states each requirement, how TEC meets it, and where the <br />evaluator will find the supporting evidence in this submittal. <br />Requirement How TEC Satisfies It Evidence / Location <br />MQR #1 — Licensing <br />Active Florida registration (Sunbiz Doc. No. L16000044355; <br />Certificate of Status issued March 25, 2026 — status: <br />ACTIVE). Key personnel licensed under F.S. Chapter 471: <br />Omar Herrera, PE No. 89107 (exp. 02/28/2027); firm <br />Certificate of Authorization No. 32937. <br />Section 1 — Attachments 1-A <br />(licenses) and 1-B (Sunbiz, Local <br />Business Tax Receipts), per <br />Addendum No. 7 (A1) <br />MQR #2 — Experience (3 <br />contracts, similar size & <br />scope, 2020–2025, <br />preferably government) <br />TEC has held more than the required three (3) <br />government contracts of similar size and scope within <br />2020–2025, each as PRIME consultant. Five are provided <br />for meeting this criterion: (1) City of North Miami Beach — <br />Engineering & Project Management Services, Public Works <br />Department; (2) City of North Miami — Owner's Engineer <br />Representative & Project Management Services; (3) Town <br />of Bay Harbor Islands — Continuing Engineering & Capital <br />Program Support; (4) Seminole Tribe of Florida — Project <br />Management Services for Transportation Projects; (5) <br />Miami-Dade Water and Sewer Department — Senior <br />Cadastral Technician Services Supporting the CIP. See the <br />discipline-coverage matrix below (Addendum No. 7, A3). <br />Section 5 — Project Description <br />Forms Nos. 1, 2, 3, 6 and 11 <br />MQR #3 — Three Reference <br />Questionnaire Letters (City <br />form, RFQ p. 41; same <br />projects as MQR #2; TEC as <br />primary consultant) <br />TEC provides three (3) completed and signed City <br />Reference Questionnaires, each from a client on an MQR <br />#2 prime contract and matching Project Description Forms <br />Nos. 1, 2, and 3: City of North Miami Beach (Gregory <br />Christian, Engineering & Construction Manager), City of <br />North Miami (Thomas Positano, CSM, Interim Public <br />Works Director), and Town of Bay Harbor Islands (Sam <br />Zamacona, EI, CIP Director). TEC served as primary (prime) <br />consultant on each. Per Addendum No. 6 (A2), three <br />reference questionnaires are sufficient for the entire <br />submission. <br />Appendix D — Signed Reference <br />Questionnaires (3); Section 5 — <br />References <br />MQR Contract Discipline Coverage (per Addendum No. 7, A3–A4) <br />MQR Prime Contract General Civil Engineering (No. <br />3)CEI (No. 8) <br />City of North Miami Beach — Engineering & PM <br />Services, Public Works <br />Roadway, drainage & stormwater <br />design; MS4/NPDES; permitting; <br />OPCCs; plan review <br />On-site inspection, daily reports, <br />pay-app verification, as-builts <br />across capital projects <br />City of North Miami — Owner's Engineer <br />Representative & PM Services <br />Pump-station rehabilitation design <br />& permitting (DERM); utility & <br />Full CEI on construction incl. <br />Banyan wet-well rehab & NE 126th <br />The Engineering Company, LLC | RFQ #26-07-01 — Continuing Professional A/E Consulting Services (CCNA) <br />Page 4 of 96
The URL can be used to link to this page
Your browser does not support the video tag.