My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
THE ENGINEERING COMPANY Bid Document (24)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
THE ENGINEERING COMPANY
>
THE ENGINEERING COMPANY Bid Document (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:21:24 PM
Creation date
8/31/2026 3:20:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT 2 — Owner's Engineer Representative & Project Management Services <br />Client City of North Miami, FL TEC Role Prime Consultant <br />Location North Miami, FL Performance 03/2023 – 12/2024 <br />Construction Cost $3 Million+TEC Fee $250,000 <br />Reference Nakia Johnson-Preston, CPWP-S, Public <br />Works Operations Chief Phone / Email (305) 215-3463 | <br />najohnson@northmiamifl.gov <br />Project Overview <br />As the City of North Miami's Owner's Engineer, TEC combined design management, CEI, permitting, and program controls <br />across more than 20 active capital projects. The signature assignment was the Banyan Pump Station Rehabilitation: a <br />duplex wet-well station damaged by vehicle impact and placed under a Miami-Dade DERM moratorium. TEC performed <br />field survey and hydraulic modeling, prepared a complete permit set, secured DERM approval for flood-resilient retrofits — <br />including a watertight, traffic-rated access hatch — and then carried the project through procurement assistance and <br />construction QA/QC. <br />TEC also delivered full CEI on the NE 126th Street Parking Improvements (ten new on-street stalls) with daily photo reports, <br />pay-requisition review, submittal tracking, meetings, and walkthroughs — completed on time and on budget. Program- <br />management services included weekly CIP tracker updates, site inspections, QA/QC review of scopes, plans, permits, and <br />pay applications, and meeting minutes for progress, pre-bid, and construction meetings. TEC additionally managed a <br />citywide streetlight assessment-and-repair program (logging and driving 100+ FPL/County repair tickets through a GIS <br />tracker) and led an Advanced Metering Infrastructure (AMI) assessment producing compliance matrices and 10-year life- <br />cycle cost models. <br />Scope of TEC Services <br />•Owner's-representative oversight of 20+ concurrent CIP projects — design management, permitting, procurement support, <br />and construction QA/QC <br />•Banyan Pump Station: survey, hydraulic modeling, complete permit set, DERM moratorium resolution, flood-resilient retrofit <br />design, and construction-phase QA <br />•Full CEI on roadway/parking construction: daily photo reports, pay-requisition review, submittal tracking, and closeout <br />•Weekly CIP tracker, QA/QC review of scopes, plans, permits, and pay applications; progress/pre-bid/construction meeting <br />minutes <br />•Citywide streetlight assessment and repair management with GIS-based FPL/County ticket tracking <br />•AMI assessment: compliance matrices and 10-year life-cycle cost models for phased implementation <br />Relevance to the City of Sunny Isles Beach (Civil No. 3 / CEI No. 8) <br />•Designated-representative services. Exactly the City's-engineer staff-extension role contemplated by the RFQ's Civil scope — <br />including plan review, permitting strategy, and pay-application verification. <br />•Pump-station engineering + CEI. Wet-well rehabilitation from DERM moratorium through construction — directly relevant to <br />the City's stormwater pump conversions and utility assets. <br />•MQR-2 / MQR-3 project. Prime government contract with a signed Reference Questionnaire at Appendix D. <br />Results <br />TEC helped the City advance more than 20 capital projects: restoring the damaged Banyan pump station to service <br />(including securing DERM approvals), delivering the NE 126th Street parking improvements on time and on budget, clearing <br />The Engineering Company, LLC | RFQ #26-07-01 — Continuing Professional A/E Consulting Services (CCNA) <br />Page 50 of 96
The URL can be used to link to this page
Your browser does not support the video tag.