Laserfiche WebLink
PROJECT 3 — Continuing Engineering & Capital Program Support <br />Client Town of Bay Harbor Islands, FL TEC Role Prime Consultant <br />Location Bay Harbor Islands, FL Performance 12/2025 – Ongoing <br />Construction Cost Town-wide 30-Year CIP portfolio <br />(program support)TEC Fee $100,000 (combined authorizations) <br />Reference Sam Zamacona, EI, Director of Capital <br />Improvement Program Phone / Email (305) 866-6241 Ext. 105 | <br />szamacona@bayharborislands-fl.gov <br />Project Overview <br />The Town of Bay Harbor Islands — a barrier-island municipality of the same coastal character as Sunny Isles Beach — <br />engaged TEC as its prime consultant for capital-program engineering support, delivered through two combined <br />authorizations totaling approximately $100,000 ($49,900 and $49,880 not-to-exceed). Under the first authorization <br />(December 2025), TEC deployed a GIS-powered, live CIP Dashboard on the Esri platform with secure role-based access; <br />engaged all ten Town department directors to compile and prioritize a 30-year Capital Improvement Program; and prepared <br />the Town Council's January 2026 retreat presentation summarizing projects by department, stage, location, and cost band. <br />Under the second authorization (February 2026), TEC is meeting with the Town's contractors and consulting engineers to <br />gather project-level data — budgets, annual expenditures, funding sources, and schedules — populating the dashboard <br />using five standardized project phases (Planning, Design Procurement, Design, Construction Procurement, Construction), <br />and configuring a resident-facing public CIP portal for the Town's website, giving residents a clear, simplified view of every <br />capital project. <br />Scope of TEC Services <br />•Esri (ArcGIS Online/Portal) CIP dashboard configuration: portfolio KPIs, project drill-downs, secured groups, and role-based <br />permissions <br />•Data model and schemas (Projects, Milestones, Funding, Spend, Risks, Attachments) with ETL pipelines and staged connectors <br />for Cityworks / e-Builder / Primavera <br />•Engagement of ten department directors; development of a prioritized 30-year CIP from department inputs and the Town's <br />current list <br />•January 2026 Council retreat presentation — projects by department, stage, location, and cost band <br />•Vendor engagement and data collection across the Town's contractors and consulting engineers <br />•Dashboard data population using five standardized project-phase types; resident-facing public portal and website integration <br />•Kickoff, project management, QA/QC, action/risk/issue logs, and monthly status notes across both authorizations <br />Relevance to the City of Sunny Isles Beach (Civil No. 3 / CEI No. 8) <br />•Barrier-island peer city. Program support for an island municipality facing the identical tidal-drainage, seawall, and <br />constrained-corridor conditions as Sunny Isles Beach. <br />•The RFQ's records & mapping scope, delivered. Computerized (GIS) mapping, capital-program records, and financial/program <br />visibility — the RFQ's Category-3 services for maps, records, and program consultation, in live production. <br />•Transparent program controls. The same dashboard-driven CIP visibility TEC would stand up for the City's capital portfolio <br />under this contract. <br />•MQR-2 / MQR-3 project. Prime government contract with a signed Reference Questionnaire at Appendix D. <br />The Engineering Company, LLC | RFQ #26-07-01 — Continuing Professional A/E Consulting Services (CCNA) <br />Page 52 of 96