Laserfiche WebLink
PROJECT 6 — Project Management Services for Transportation Projects <br />Client Seminole Tribe of Florida TEC Role Prime Consultant <br />Location Hollywood / Big Cypress, FL Performance 2023 – 2024 <br />Construction Cost $3 Million (est.)TEC Fee $250,000 <br />Reference Emran Rahaman, Project Manager Phone / Email (954) 894-1060 x10923 <br />Project Overview <br />The Seminole Tribe of Florida retained TEC as its on-call engineering, project management, and construction-inspection lead <br />for tribal-wide transportation improvements. Task orders spanned roundabout design, roadway resurfacing, drainage <br />upgrades, driveway rehabilitation, street lighting, traffic signs, and emergency embankment repairs — all delivered under <br />FDOT standards and Tribal regulations, with permit approvals coordinated across FDOT, County, and Tribal Environmental <br />offices. <br />Two outcomes define the engagement. When a storm washed out a roadway embankment, TEC fast-tracked a design–bid– <br />build repair completed in five weeks instead of the typical eight to twelve — saving approximately $50,000 by optimizing <br />rip-rap and geofabric pinning details. And on the roundabout program, TEC's resized geometry improved traffic flow, <br />eliminated excess MOT costs, and produced $58,000 in savings while increasing contractor bid participation from 50% to <br />75%. <br />Scope of TEC Services <br />•Engineering and permitting: plans, hydraulic calculations, BMPs, and permit packages (FDOT, County, Tribal Environmental) <br />•Construction management and CEI: daily field reports with photos, pay-requisition review, submittal tracking, QA/QC testing, <br />and MOT oversight <br />•Emergency embankment washout repair: fast-tracked design–bid–build delivered in 5 weeks <br />•Roundabout optimization: resized geometry, improved flow, reduced MOT — $58,000 saved; bid participation up from 50% <br />to 75% <br />•Program controls: erosion-control BMP manual, FDOT-based traffic-calming guide, weekly CIP dashboards, and stakeholder <br />briefings <br />Relevance to the City of Sunny Isles Beach (Civil No. 3 / CEI No. 8) <br />•Cost control, proven. The Section 4 value-engineering example — documents that were both economical and biddable, with <br />measurable savings on two task orders. <br />•Emergency responsiveness. A five-week storm-damage repair is the operating tempo a hurricane-exposed coastal city needs <br />from its continuing consultant. <br />•Roadway breadth. The full menu of corridor task-order types this contract will generate — resurfacing, lighting, signage, <br />drainage, and traffic calming. <br />•MQR #2 prime contract. One of the five prime government contracts satisfying MQR #2 (see the Compliance Summary). <br />Results <br />TEC's PM/CEI role delivered tangible performance gains across tribal transportation projects: an emergency embankment <br />repair completed in 5 weeks instead of 8–12 (saving approximately $50,000), an optimized roundabout that cut MOT costs <br />and lifted bid participation from 50% to 75% (saving $58,000), and standardized tools — an erosion-control BMP manual, a <br />traffic-calming guide, and weekly CIP dashboards — that improved coordination, cost control, and safety outcomes across <br />multiple reservations. <br />The Engineering Company, LLC | RFQ #26-07-01 — Continuing Professional A/E Consulting Services (CCNA) <br />Page 58 of 96