My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
THE ENGINEERING COMPANY Bid Document (24)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
THE ENGINEERING COMPANY
>
THE ENGINEERING COMPANY Bid Document (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:21:24 PM
Creation date
8/31/2026 3:20:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT 10 — WWTP RAS/WAS Pump-Station Construction — Resident Project Representative <br />Client City of Boca Raton TEC Role Subconsultant <br />Location Boca Raton, FL Performance 05/2025 – Ongoing <br />Construction Cost $5 Million+TEC Fee $100,000 (to date) <br />Reference Tung Nguyen, Associate Vice President Phone / Email (703) 338-1939 | ttnguyen@carollo.com <br />Project Overview <br />TEC provides Resident Project Representative services during rehabilitation of the Return Activated Sludge (RAS) and Waste <br />Activated Sludge (WAS) pump station at the Boca Raton Wastewater Treatment Plant. The RPR scope centers on on-site <br />observation and inspection of pump replacements, piping tie-ins, and associated electrical upgrades; daily reporting with <br />quantities, photos, and safety checks; and field-issue resolution with the contractor — tracking progress against a 660-day <br />construction schedule while respecting contractor means and methods. <br />Complementing the field effort, TEC provides Services During Construction on an as-requested basis: shop-drawing and <br />submittal reviews (including re-submittals), RFI responses, monthly progress meetings, pay-application quantity verification, <br />startup/testing and operator-training coordination, and substantial/final completion inspections with punch-list <br />development and closeout documentation. The work proceeds inside an active operating facility — requiring careful <br />sequencing around live process flows, electrical tie-ins, and continuous plant operations. <br />Scope of TEC Services <br />•Full-time RPR inspection of pump replacements, piping tie-ins, and electrical upgrades <br />•Daily reports with quantities, photographs, and safety checks; deficiency logs and follow-up tracking <br />•Shop-drawing/submittal and RFI review; monthly progress meetings; pay-application quantity verification <br />•Startup, performance testing, and operator-training coordination <br />•Substantial and final completion inspections, punch lists, and closeout documentation <br />Relevance to the City of Sunny Isles Beach (Civil No. 3 / CEI No. 8) <br />•Active-facility CEI. Inspection inside operating infrastructure — the constraint profile of most City retrofit work on live <br />drainage, utility, and building systems. <br />•FBC-trade inspection depth. Mechanical, electrical, and plumbing inspection capability the RFQ's CEI scope explicitly requires. <br />•Pump-station specialization. The precise asset class behind the City's stormwater pump conversion program. <br />Results <br />TEC's embedded RPR and Services During Construction role provides the City of Boca Raton with continuous, audit-ready <br />field documentation and real-time quality assurance during rehabilitation of a critical pump station — ensuring pump <br />replacements, piping tie-ins, and electrical upgrades conform to plans and specifications while the treatment facility <br />remains in uninterrupted operation. <br />The Engineering Company, LLC | RFQ #26-07-01 — Continuing Professional A/E Consulting Services (CCNA) <br />Page 66 of 96
The URL can be used to link to this page
Your browser does not support the video tag.