My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
THE ENGINEERING COMPANY Bid Document (24)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
THE ENGINEERING COMPANY
>
THE ENGINEERING COMPANY Bid Document (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:21:24 PM
Creation date
8/31/2026 3:20:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6 — CONTRACT FORMS <br />All Bid Submittal forms and affidavits required by RFQ Section 6, as amended by Addenda Nos. 4, 5, 6, and 7, are <br />completed, executed, and included in this section of the submittal in the order listed below. Notarized instruments <br />are indicated. Per Addendum No. 6 (A1), the revised Discipline Acknowledgement Form issued with Addendum No. <br />5 is used; per Addendum No. 4 (A16), the revised Conflict of Interest Statement is used in place of the original form. <br />Form / Affidavit RFQ Ref.Status in This Submittal Notary <br />Acknowledgement of Addenda (RFQ p. 37)p. 37 <br />Completed — Addenda Nos. 1 (07/10/26), 2 <br />(07/20/26), 3 (07/22/26), 4 (07/23/26), 5 <br />(07/28/26), 6 (07/29/26), 7 (08/03/26), 8 <br />(08/07/26), and 9 (08/10/26) acknowledged; <br />DemandStar monitored through submission <br />for any further addenda <br />No <br />Form 6.3 — Discipline Acknowledgement — <br />REVISED FORM per Addendum No. 5 <br />(mandatory per Addendum No. 6, A1) <br />Add. 5 <br />Disciplines checked: No. 3 General Civil <br />Engineers and No. 8 CEI. Line (a) MEP: NONE <br />— PERFORMED IN-HOUSE (M-D Certs <br />12.00/13.00). Line (b) Structural: NONE — <br />PERFORMED IN-HOUSE (M-D Cert 11.00). Line <br />(c) Surveyors & Mapping: SUB-CONSULTANT — <br />Longitude Surveyors, LLC. Line (d) <br />Geotechnical: SUB-CONSULTANT — NV5 <br />Global, Inc. <br />No <br />Questionnaire (pp. 39–40)pp. 39–40 Completed — draft answers reproduced below <br />for transcription onto the City form No <br />Reference Questionnaires ×3 (p. 41)p. 41 <br />Three completed and signed questionnaires <br />from MQR #2 prime-contract clients (Projects <br />1, 2, and 3) — Appendix D <br />No <br />Bid Submittal Form & Signature Page (pp. <br />42–43)pp. 42–43 <br />SIGNED by Omar Herrera, PE — page 43 <br />signature confirmed per Addendum No. 7 (A5); <br />an unsigned submittal is non-responsive <br />No <br />Anti-Human Trafficking Affidavit Section 6 Executed Yes <br />Non-Collusion Affidavit Section 6 Executed Yes <br />Sworn Statement — Public Entity Crimes (F.S. <br />287.133)Section 6 Executed Yes <br />Equal Opportunity / Affirmative Action <br />Statement Section 6 Executed No <br />Conflict of Interest Statement — REVISED <br />FORM per Addendum No. 4 (A16)Add. 4 <br />Executed on the corrected form issued with <br />Addendum No. 4 (bid description now reads <br />RFQ #26-07-01) <br />Yes <br />Dispute Disclosure Section 6 Executed — no disputes to disclose No <br />Anti-Kickback Affidavit Section 6 Executed Yes <br />The Engineering Company, LLC | RFQ #26-07-01 — Continuing Professional A/E Consulting Services (CCNA) <br />Page 70 of 96
The URL can be used to link to this page
Your browser does not support the video tag.