My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
THE ENGINEERING COMPANY Bid Document (24)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
THE ENGINEERING COMPANY
>
THE ENGINEERING COMPANY Bid Document (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:21:24 PM
Creation date
8/31/2026 3:20:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX D — SIGNED REFERENCE QUESTIONNAIRES (CITY FORM — RFQ PAGE <br />41) <br />Contents of this appendix (documents follow this divider in the assembled PDF submittal): <br />•City of North Miami Beach — Gregory Christian, Engineering & Construction Manager (signed questionnaire enclosed) <br />•City of North Miami — Thomas Positano, CSM, Interim Public Works Director (signed questionnaire enclosed) <br />•Town of Bay Harbor Islands — Sam Zamacona, EI, Director of CIP (signed questionnaire enclosed) <br />The Engineering Company, LLC | RFQ #26-07-01 — Continuing Professional A/E Consulting Services (CCNA) <br />Page 93 of 96
The URL can be used to link to this page
Your browser does not support the video tag.