My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group, Inc. Bid Document (15)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
The Corradino Group, Inc
>
The Corradino Group, Inc. Bid Document (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:25:55 PM
Creation date
8/31/2026 3:22:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 16CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 1 | COMPANY INFORMATION <br />Florida Department of Transportation <br />RON DESANTIS <br />GOVERNOR 605 Suwannee Street <br />Tallahassee, FL 32399-0450 <br />JARED W. PERDUE, P.E. <br />SECRETARY <br />1 <br />June 16, 2026 <br />Jessica McRory, President <br />AREHNA ENGINEERING INC. <br />5012 W Lemon Street <br />Tampa, FL 33609 <br />jmcrory@arehna.com <br />Dear Ms. McRory: <br />The Florida Department of Transportation has reviewed your application for prequalification <br />package and determined that the data submitted is adequate to technically prequalify your firm <br />for the following professional services types of work per Rule 14-75, F.A.C.: <br />9.1 -Soil Exploration <br />9.2 - Geotechnical Classification Lab Testing <br />9.3 -Highway Materials Testing <br />9.4.1 - Standard Foundation Studies <br />9.4.2 -Non-Redundant Drilled Shaft Bridge Foundation Studies <br />9.5 - Geotechnical Specialty Lab Testing <br />10.3 - Construction Materials Inspection <br />Your firm is now technically prequalified with the Department for Professional Services in the <br />above referenced work types. The overhead audit has been accepted, and your firm may pursue <br />projects in the referenced work types with fees of any dollar amount. This status shall be valid <br />until June 30, 2027, for contracting purposes. <br />Approved Rates <br />Home <br />Overhead <br />Field <br />Overhead <br />Facilities <br />Capital Cost <br />of Money <br />(FCCM) <br />Premium <br />Overtime <br />Home <br />Direct <br />Expense <br />Field <br />Direct <br />Expense <br />Published <br />Fee <br />Schedule <br />180.21%128.51%2.180%Reimbursed 4.59%5.73%Yes
The URL can be used to link to this page
Your browser does not support the video tag.