My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group, Inc. Bid Document (15)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
The Corradino Group, Inc
>
The Corradino Group, Inc. Bid Document (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:25:55 PM
Creation date
8/31/2026 3:22:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 21CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 1 | COMPANY INFORMATION <br />| ACKNOWLEDGEMENT OF ADDENDA <br />RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING <br />SERVICES (CCNA) <br />Page 37 <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br />SECTION 6 <br />BID SUBMITTAL FOR: <br />ACKNOWLEDGEMENT OF ADDENDA <br />INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES <br />PART I: <br />LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID <br />Addendum #1, Dated <br />Addendum #2, Dated <br />Addendum #3, Dated <br />Addendum #4, Dated <br />Addendum #5, Dated <br />Addendum #6, Dated <br />Addendum #7, Dated <br />Addendum #8, Dated <br />PART II: <br /> NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID <br />PROPOSER NAME: <br />AUTHORIZED SIGNATURE: DATE: <br />TITLE OF OFFICER: <br />JULY 10, 2026 <br />JULY 20, 2026 <br />The Corradino Group, Inc. <br />8/12/2026 <br />President and CEO <br />JULY 22, 2026 <br />JULY 23, 2026 <br />JULY 28, 2026 <br />JULY 29, 2026 <br />AUGUST 3, 2026 <br />AUGUST 7, 2026 <br />AUGUST 10, 2026Addendum #9, Dated
The URL can be used to link to this page
Your browser does not support the video tag.