My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group, Inc. Bid Document (15)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
The Corradino Group, Inc
>
The Corradino Group, Inc. Bid Document (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:25:55 PM
Creation date
8/31/2026 3:22:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 57CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 2 | QUALIFICATIONS <br />ENGINEERS · PLANNERS · PROGRAM MANAGERS <br />CLIENT NAMECLIENT NAMECity of Hollywood <br />ADDRESSADDRESS2600 Hollywood Blvd, Room 422 Hollywood, FL 33021 <br />CONTACT PERSONCONTACT PERSONMark Johnson, PMP Senior Project Manager <br />PHONE NUMBERPHONE NUMBER 954.921.3991 <br />EMAIL EMAIL mljohnson@hollywoodfl.org <br />PROJECT START DATEPROJECT START DATE 01/2023 <br />PROJECT COMPLETION DATEPROJECT COMPLETION DATE Ongoing <br />CONTRACT TYPE CONTRACT TYPE Continuing <br />Services Contract <br />PROJECT COST PROJECT COST $750,000 <br />SCOPE OF SERVICESCOPE OF SERVICETraffic and Transportation Engineering Services <br />JOHNSON STREET BRIDGE REPLACEMENT <br />CITY OF HOLLYWOOD <br />Corradino prepared roadway, drainage, bridge replacement, signing, and pavement marking plans for Johnson Street between North 31st Avenue and North 30th Road in Hollywood, Florida. The scope included an initial feasibility study and comprehensive assessment of the existing bridge, addressing: <br />1. Project Location2. Existing Structure Data and Conditions3. Purpose and Need4. Field Inspection Findings5. Alternatives and Recommendations6. Maintenance of Traffic During Construction7. Utility Impacts8. Survey Requirements9. Right-Of-Way Impacts10. Cost Estimate11. Environmental Permitting
The URL can be used to link to this page
Your browser does not support the video tag.