|
Page 88CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL
<br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)
<br />TAB 3 | STAFFING
<br />Town of Davie, Davie Road Phase 3, Davie, FL | Lead Traffic Engineer - Responsible for the preparation of a pedestrian safety study along the corridor along with the access management study between SW 39th Street and Orange Drive. Engineer of Record of the design of the two approved midblock crosswalk locations controlled with flashing beacons at Davie Road and SW 41st Place and Davie Road north of SW 43rd Street.
<br />Town of Davie, College Avenue Phase 2, Davie, FL | Lead Traffic Engineer - Prepared access management along the corridor segment from SR 84 to Nova Drive. Engineer of Record of the signal modifications needed at College Avenue and Nova Drive due to the widening of the College Drive corridor.
<br />City Traffic Engineering Services, Pembroke Pines, FL | Lead Traffic Engineer - Traffic Engineer on this continuing services contract for traffic engineering task work orders; including traffic peer review services.
<br />City of Oakland Park, Andrews Avenue Pedestrian Safety Study, Oakland Park, FL | Traffic Engineer - Completed a safety analysis and evaluated the need for mid-block crosswalks along Andrews Ave between Oakland Park Blvd and Prospect Road.
<br />Weston Road Corridor Signal Retiming, Weston, FL | Lead Traffic Engineer - Performed signal retiming for all signalized intersections along the Weston Road corridor to improve signal coordination and overall efficiency along corridor’s roadway network.
<br />MLK Blvd Corridor Improvements, Pompano Beach, FL - Signalization Engineer of Record. Resurfacing, restoration, and rehabilitation of the corridor from east of the Florida Turnpike to Power Line Road.
<br />Broward County Intersection Improvements Prioritization Study | Subconsultant, CTS Engineering, Inc. - The Consultant developed a comprehensive process to assist Broward County in identifying and prioritizing the top 100 intersection locations based on their needs. The top locations were study using detailed crash analysis, operational analyses, field reviews, and conducting engineering feasibility assessment to develop improvement concepts along with cost estimates. The identified improvements will be programmed as projects for implementation utilizing the Broward County Surtax Funding. Corradino provided scoping reports for the intersections of Coconut Creek Parkway and Lyons Road, and the Hillsboro Boulevard and State Road 7.
<br />Broward County Continuing Engineering Services Contract for Traffic, Roadway and Civil, Broward County, FL | Deputy Project Manager & Lead Traffic Engineer - This contract provided services to the county for design , plan preparation and construction engineering inspection of different types of construction improvements projects; such as, mast arm conversions, traffic signal infrastructure improvements, signalized and unsignalized school crossings, signing and pavement marking, minor roadway improvements, fiber optic installation, bicycle and pedestrian facilities upgrades, drainage, as well as lighting analysis and design services.
<br />Broward County Highway Engineering Mast Arm Conversion Group 1 & 2 , Broward County, FL | Engineer of Record - Design-build project consisting in the conversion of span-wire supported traffic signals to mast arm traffic signals at 35 intersections within Broward County. This contract provided engineering and design services, plans preparation, field survey, utility coordination, permitting, public involvement, coordination with adjoining projects, minor roadway reconstruction and paving, signing and pavement marking, ADA compliant sidewalk reconstruction, traffic signal construction, installation of underground conduit and interconnect cable, installation of monitoring devices (video detection), installation of vehicle pre-emption systems, as-built record plans, and warranty necessary to provide the traffic signalization improvements in accordance with Broward County and Florida Department of Transportation specifications.
<br />Town of Surfside, Harding Avenue Traffic Signal Improvements, Surfside, FL | Signalization Engineer of Record - Included the addition of traffic signal infrastructure to the intersections of Harding Ave at 88th Street, 93rd Street, and 94th Street, and 96th Street to improve traffic circulation on the Harding Ave corridor.
<br />Downtown Boca Raton Traffic Study Traffic Engineer, Boca Raton, FL | Traffic Engineer - Study Traffic Engineer. Evaluated the traffic operations of Palmetto Park Road and NE/SE 5 Avenue and seven surrounding intersections.
<br />Town of Palm Beach, Commercial Areas Traffic Study, Palm Beach, FL | Lead Engineer - Responsible for the evaluation of the existing 2023 and future 2028 traffic operations conditions for the AM and PM peak periods at 23 signalized/unsignalized intersections within the Town of Palm Beach as well as the analysis of the conversion of South Lake Drive from a 2-lane 2-way corridor to a one way only in order to provide additional on-street parking for the local residents. Study also include Origin-Destination Analysis to determine local daily and weekend trips to the Town, Valet parking analyses at 18 restaurants, and parking studies for the Town’s commercial parking district.
<br />DIANA WHITE, PE, PTOE, RSP1SENIOR PROJECT MANAGER
|