My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
The Corradino Group, Inc. Bid Document (15)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
The Corradino Group, Inc
>
The Corradino Group, Inc. Bid Document (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:25:55 PM
Creation date
8/31/2026 3:22:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 91CITY OF SUNNY ISLES BEACH • RFQ #26-07-01 • CONTINUING PROFESSIONAL <br />ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br />TAB 3 | STAFFING <br />YEARS OF EXPERIENCE <br />29 <br />EDUCATION <br />BS, Civil Engineering, AuburnUniversity, 1996 <br />PROFESSIONAL REGISTRATIONS <br />● Professional Engineer: Florida No. 86930 Tennessee No. 106514 Alabama No. 24234 Georgia No. 37695 Kentucky No. 34511 <br />● Professional Traffic Operations Engineer <br />MEMBERSHIPS/ AFFILIATIONS <br />● Institute of Transportation Engineers (ITE) <br />● Intelligent Transportation Society of Tennessee (ITS TN) <br />Mr. Bolden has 29 years of experience in transportation planning, traffic engineering, and geometric design. His experience includes corridor studies, roadway safety audits, interchange studies, traffic impact studies, traffic signal design, operations and timing, Intelligent Transportation Systems (ITS) planning and design, capacity analysis and modeling utilizing HCS, CORSIM and Synchro, intersection geometric designs, workzone traffic control plans, and cost estimates. <br />GERALD G. BOLDEN, PE, PTOE <br />VICE PRESIDENT AND <br />DIRECTOR OF ENGINEERING <br />EXPERIENCE <br />Martin MPO, US 1/SR 5/Federal Highway and SW Palm City Road in Stuart, FL | Project Manager - Facilitates high speed right turns from southbound US 1 onto southbound SW Palm City Road. SW Palm City Road is an attractive alternative parallel route to SR 76/Kanner Highway; however, because of its primarily residential land use, lower traffic speeds are appropriate. To help manage speeds along SW Palm City Road and improve safety and mobility for all modes at the subject intersection, the Martin MPO issued this task work order to evaluate conceptual design alternatives and gather input from the public and relevant stakeholders to select a recommended alternative to eliminate the free flow right and replace it with a hard right turn lane at the signalized intersection. The scope of work included traffic data collection (intersection manual turning movement counts, speed volume tube counts), field review, multimodal evaluation, traffic operational analysis, alternatives evaluation and concept development. <br />FDOT D6, SR 934/West 21st Street/Hialeah Expressway at West 8th Avenue/NW 62nd Avenue Safety Study | Project Engineer - Responsible for the overall scope of work for the intersection safety and operational analysis at the project intersection. The overall scope of work included intersection inventory; crash analysis, level of service analysis, development of recommendations, calculation of preliminary cost estimates, determination of project benefits, and preparation of the final safety and operations report. <br />City of Fort Lauderdale, Fort Lauderdale-Hollywood International Airport (FLL) Crosswalk Signalization, Fort Lauderdale, FL | Technical Manager - Responsible for the design of signalized crosswalks at three locations within the FLL internal loop road for arriving flights. The primary goals of the project are to increase pedestrian safety and improve vehicular traffic flow. The scope of the design includes: layout of traffic signal control equipment; traffic signal wiring; pedestrian signalization and push buttons; ADA ramps; design of a bulb-out for pedestrian refuge along the terminal side of the crosswalk; development of coordinated signal phasing and timing of the three signalized crosswalks utilizing Synchro software; emergency vehicle preemption; signing; LED lighting; pavement markings and rumble stripes. The development of the design plans and bid package are being completed within a restricted schedule due to contracting requirements for FLL and the need for construction to be completed during off-peak tourist periods. <br />TDOT, Continuing Traffic Engineering Services, Statewide | Client/Project Manager - Complete oversight of the continuing services contract with TDOT. The project scopes include traffic signal warrant analysis, traffic signal design, traffic signal phasing and timing, roadway safety analysis, operational analysis, fiber-optic communications design, intersection geometric design, and roadway lighting. <br />ENGINEERS PLANNERS PROGRAM MANAGERS
The URL can be used to link to this page
Your browser does not support the video tag.