|
City of Sunny Isles Beach | RFQ 26-07-01
<br />Continuing Professional Architectural and Engineering | Architects
<br />46
<br />Michele Gonzalez-VidalPrincipal/Interior Design 2 OF 2
<br />• Doral Government Center Improvements, Doral, FL. The project consists of miscellaneous Tenant Improvements to
<br />the Doral City Hall building located at 8401 NW 53rd Terrace in Doral, Florida. The project scope includes space planning,
<br />a new recording studio, security glazing, A/C and IT rooms remodeling. Key Features: Building Remodeling and/or New
<br />Construction; Interior Design; Space Planning; ADA Accessibility Architectural Design; Remodeling. Contract Amount:
<br />$345,750 Role: Principal-in-Charge of Interior Design; Client: City of Doral/APCT Engineers; Start/End Dates: 2020/2022.
<br />• Doral Meadow Park Renovations, Doral, FL. The project consists of the design, engineering, and construction efforts
<br />to enclose the existing covered outdoor patio space to provide 800 square feet of multi‐purpose indoor recreation space.
<br />The men’s and women’s restrooms are to be completely renovated and brought to the latest applicable codes, including
<br />new stall partitions, ADA bathroom fixtures, mirrors, and handlebars as needed. Key Features: Building Remodeling; New
<br />Construction; Architectural Design; Renovation; Multi-Purpose Space; Recreation Space; Conference Room; Restroom
<br />Modernization; ADA Accessibility. Contract Amount: $1.2 million; Role: Project Architect/Interior Design Client: APCT
<br />Engineers; Start/End Dates: 2020/2020
<br />• Miami-Dade County Biscayne Plaza Building Improvements, Homestead, FL. V3 is providing full architectural and
<br />engineering services to improve the safety, resiliency, and operational performance of the Biscayne Plaza facility at 15201
<br />SW 281st Street. Work includes impact-resistant windows and doors, a 100%-capacity emergency generator, exterior
<br />surface repairs and refinishing, reroofing, MEP and fire-alarm modifications, wind-load analysis, permit dry-run support,
<br />bidding assistance, and Construction Administration including site visits and RFI and submittal reviews. Role: Principal-
<br />in-Charge of Interior Design; Client: Miami-Dade County; Start/End Dates: 04/2020-Ongoing-08/2026.
<br />• Brothers to the Rescue Restoration & Relocation, Hialeah Gardens, FL. Brothers to the Rescue Monument Restoration
<br />and Relocation. SR 25 / Okeechobee Rd from E of NW 116 Way to E of NW 87 Avenue. Project consists of the restoration
<br />and relocation of the Brothers to the Rescue Monument, which was created to commemorate four Brothers to the Rescue
<br />fliers that were shot down and killed on the orders of Fidel Castro while they flew two civilian planes through international
<br />airspace in a search and rescue mission for Cuban rafters. Scope of work involves Architecture, Historic Preservation,
<br />Mechanical and Electrical Engineering coordination with FDOT and the City of Hialeah Gardens. Role: Project Architect;
<br />Cost: $216 M Client: BCC Engineering.
<br />• Golden Glades Multimodal Transportation Facility, Miami, FL. This is a transportation hub serving as an effective
<br />center of activity for MDTPW’s vision of desired modal connectivity. Integrates a 2,450-car multi-story parking garage;
<br />pedestrian bridge; landscaping, hardscaping. Gateway features, 14 bus bays and 860 FT. total length of layover area;
<br />bus driver’s break lounge; transit hub building, Intercity Bus Terminal, and Bus hub. Contract Amount: $ 57 million; Role:
<br />Project Architect/Interior Design; Client: Florida Department of Transportation; Delivery Method: Design/Build; Start/End
<br />Dates: 2018 to 2021.
<br />• Senator Villas Affordable Housing Apartments, Miami-Dade County, FL. 21,299 SF affordable housing apartment
<br />building on a 28,680 SF site consisting of 23 units for the elderly. The project comprises a two-story, 23-unit building and
<br />includes one- and two-bedroom rental units and studios. Contract Amount: $4.9 million; Role: Project Architect/Interior
<br />Design; Client: Miami-Dade Public Housing and Community Development (PHCD); Start/End Dates: 07/2017 to 03/2019.
<br />• Dolphin Station Park-and-Ride Transit Terminal Facility, Miami-Dade County, FL. 552,366 SF Park-and-Ride with
<br />819 parking spaces. Project includes transit hub, trucker’s lounge, bus bays, and pedestrian canopies. Contract Amount:
<br />$16.9 million; Role: Project Architect/Interior Design Client: MDX; Start/End Dates: 06/2016 to 06/2018.
<br />• Estefan Kitchen, Miami, FL. Architectural and Interior Design services for a restaurant located in the Miami Design
<br />District. This restaurant consists of 5,013 SF. Project areas include indoor and outdoor areas for a 1950’s Cuban-themed
<br />restaurant. Coordination consisted of structural, mechanical, electrical, and plumbing engineers. Life safety analysis was
<br />a critical part of the scope of work, as well as licensing to obtain a liquor license. Contract Amount: $2.166 million; Role:
<br />Project Architect and Interior Design; Client: Estefan Enterprises; Start/End Dates: 07/2016 to 2/2017.
|