Laserfiche WebLink
City of Sunny Isles Beach | RFQ 26-07-01 <br />Continuing Professional Architectural and Engineering | Architects <br />67 <br /> <br /> RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING <br />SERVICES (CCNA) <br /> Page 39 <br /> <br />CITY OF SUNNY ISLES BEACH <br />18070 Collins Ave. | Sunny Isles Beach, FL 33160 <br />305.792.1707 | sibfl.net | Purchasing@sibfl.net <br /> <br />QUESTIONNAIRE <br />MUST BE INCLUDED WITH FIRM’S PROPOSAL <br /> <br />Proposer must list projects of similar project scope fulfilling the following qualification requests: <br /> <br />1. List Project Management Personnel. Personnel cannot be changed without written approval. <br /> <br />Assigned Project Manager: <br /> <br />1.2 Principal-in-Charge: <br /> <br />2. How many years has your organization been in business as a Consultant? <br /> <br /> <br />3. List current workload. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />4. Is the Proposer subcontracting any part of this work? If so, give details to major key sub- <br />Consultant’s name, address, phone number and type of work to be performed. Also, indicate the <br />percentage of the total work to be performed by the sub-Consultant. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />5. The business is a (sole proprietorship) (partnership) (corporation) and name of owner: <br /> <br /> <br />TLC Engineering Solutions, Inc.: 5757 Waterford District Drive, Suite 400, Miami, FL 33126 <br />Phone: 305.266.6553 | Work Type: Mechanical, HVAC, and Plumbing Engineering <br />Percentage of Total Work: Varies by Task Order; to be determined based on the authorized scope. <br />HBCEngineering Company: 9675 Northwest 117 Ave, 305, Miami, FL 33178 <br />Phone: (305) 232-7932 | Work Type: Structural Engineering <br />Percentage of Total Work: Varies by Task Order; to be determined based on the authorized scope. <br />Corporation <br />V3 Architectural Group maintains an active and diversified workload distributed across multiple project phases, <br />including schematic design, construction documents/permitting, and construction administration. Of the 17 unique <br />active projects identified in V3’s current workload, the majority are presently in the construction documents or <br />permitting stages, while four projects are in construction administration and one project is in schematic design. <br />Construction Documents: 12 projects — approximately 70.6% <br />Construction Administration: 4 projects — approximately 23.5% <br />Schematic Design: 1 project — approximately 5.9% <br />Jose A. Vidal, AIA, LEED AP & Manuel De Jesus Fernandez, AIA <br />Jose A. Vidal, AIA, LEED AP <br />17.5 Years