Laserfiche WebLink
DANIEL SOTOMAYOR SALDANA, PE, LEED GREEN <br />ASSOCIATE <br />Associate | Project Manager | Electrical Engineer <br />BACKGROUND <br />Daniel is a dynamic electrical engineer with a strong background in <br />designing electrical systems. He provides multidisciplinary review of <br />completed construction drawings for accuracy coordination and conformity <br />to standards, delivering innovative solutions that meet client needs and <br />project requirements. <br />EXPERIENCE <br />Boca Raton Continuing Services, Boca Raton, Florida <br />TLC provides MEP/FP engineering services since 2015 for multiple projects <br />at the City of Boca Raton. Some of the projects include: City Hall first <br />floor renovation; new generators for the Downtown Library, Spanish River <br />Library, and Building Administration Code Enforcement facility; Police <br />Department Pistol Range rooftop unit; Fire Station #7 AC design services. <br />Palm Beach Gardens Police Department Renovation and Expansion, <br />Palm Beach Gardens, Florida <br />First floor expansion of 2,778 SF and second floor architectural renovations <br />to administration area for approximately 8,598 SF. $2 Million / 11,376 sf <br />1600 N. Australian Avenue Community Center, West Plam Beach, <br />Florida <br />A one-story community center including private offices, shared office <br />space, computer station area, meeting rooms, and multi-purpose rooms. <br />The project also includes with additional space for electrical and storage <br />needs. 5,500 sf <br />Boynton Beach Police and Fire Department - Phase I, Boynton Beach, <br />Florida <br />The Fire Department is a facility approximately 12,000 square feet and <br />the Police Department is a facility approximately 52,000 square feet. The <br />Phase I services include the design package along with cost estimating <br />support to the building. The FD and PD are a portion of the Town Center <br />project for Boynton Beach with a total construction budget of $105M. The <br />construction budget for the FD is approximately $4M and the construction <br />budget for the PD is approximately $15.5M. $19.5 million / 64,000 sf <br />Town of Davie New Town Hall, Davie, Florida <br />Design-build delivery of new five-story municipal building, engineered <br />to enhance operational efficiency and long-term performance across all <br />municipal functions. Facility consists of office space, town hall chambers, <br />common areas, and other support spaces. $31.8 million / 83,619 sf <br />Sunrise Municipal Complex, Sunrise, Florida <br />Multiple building complex including 100,000 sf city hall building, water park, <br />amphitheater and 800-car parking garage. $45 million / 371,000 sf <br />Riviera Beach Fire Station #2, Riviera Beach, Florida <br />New fire station. $5,000,000 / 10,000 sf <br />EDUCATION <br />Florida International University B.S., Electrical Engineering 2017 <br />YEARS OF EXPERIENCE <br />TLC: 9 years <br />Prior: 2 years <br />REGISTRATIONS <br />PE FL 93410 <br />CERTIFICATIONS <br />LEED Green Associate, GBCI <br />PROFESSIONAL AFFILIATIONS <br />US Green Building Council (USGBC) Florida, Member <br />31