My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
West Construction, Inc. & West Architecture + DeBid Document (22)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
West Construction, Inc. & West Architecture + Design, LLC
>
West Construction, Inc. & West Architecture + DeBid Document (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:30:58 PM
Creation date
8/31/2026 3:29:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF BOCA RATON CONTINUING SERVICES CONTRACTS <br />Boca Raton, Florida <br />PRIME CONSULTANT <br />TLC Engineering Solutions <br />OWNER <br />City of Boca Raton <br />CONSTRUCTION COST <br /><$2,000,000 <br />(each project) <br />COMPLETION DATE <br />First Contract: <br />2003 – 2014 <br />Second Contract: <br />2015 – Ongoing <br />TLC SERVICES <br />Mechanical, Electrical, Plumbing <br />TLC has been working with the City of Boca Raton since 2003 under two <br />consecutive continuing services contracts. Recent projects have consisted of <br />assessments for several of their facilities and HVAC upgrades as a result of the <br />recommendations provided by TLC. All facilities remained operational during <br />renovations. <br />Selected task order projects completed under these contracts include: <br />CCTV for City Parks: CCTV system to provide coverage of the parking lots in <br />Sugar Sand Park, Lake Wyman Community Park, Patch Reef Park, Hughes Park <br />and Sand Pine Park. <br />City Hall: An addition to the IT room required the design of back-up A/C, UPS and <br />dry chemical fire suppression, as well as upgrading existing chillers. <br />Municipal Library: Extensive charrettes involving the community and library staff <br />led to the programming of a new building that incorporates green technologies <br />and materials and is eligible for LEED Certification. The library includes areas for <br />collections, computers, patron seating, employee workspace and public amenities <br />such as a coffee bar, bookstore and 200-seat multipurpose meeting room. <br />City Hall and Community Center: Upgrades for the connections from the <br />relocated transfer switches to the City Hall/Community Center, including exhaust <br />ventilation of existing Florida Power Light vault. <br />Sugar Sand Park Community Center: Review of the Test and Balance Report <br />and recommendations for remedial work to reconcile temperature or humidity <br />anomalies. <br />86
The URL can be used to link to this page
Your browser does not support the video tag.