My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
hbc engineering company Bid Document (29)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
hbc engineering company
>
hbc engineering company Bid Document (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:34:07 PM
Creation date
8/31/2026 3:31:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HBC Engineering Company | 11 As of May 2026 <br />• Alexander D. Kunkel vs. Alexander D. Kunkel vs. J.D. Eckman, Inc. / Ford Motor <br />Company / Meaghan Peltier / Robert Talia / Established Traffic Control, Inc. / KCI <br />Technologies, Inc. / Brian Leslie Watkins, PE / Pennsylvania Department of <br />Transportation (PENNDOT) / Bridgestone Americas, Inc. <br />Case No: 2020-00200 <br />Jurisdiction: Court of Common of Bucks County, Pennsylvania <br />Opened: November 2018 <br />Closed: July 2024 – Settled <br /> <br />Plaintiff was a passenger in a car with six other occupants and half of the passengers were not <br />wearing seatbelts. The driver wrecked the vehicle within a construction zone and the vehicle <br />overturned and landed on the roof. KCI designed the maintenance of traffic for the work zone. <br />In the criminal case, the driver plead guilty to recklessly endangering another person in <br />addition to other related offenses. <br /> <br />• 17-25 North Main Street, LLC v. G&S Port Chester Unit 2B, LLC / RMC Development <br />Company, LLC / Kings Capital Construction Group, Inc. / D.S. Meyer Enterprises, LLC <br />/ Sullivan Architectural Group, P.C. / Langan Engineering, Environmental, Surveying, <br />Landscape Architecture and Geology, D.P.C / M.G. McLaren, P.C. d/b/a McLaren <br />Engineering Group / Boswell Engineering, Inc. <br />Case No: 72055/2023 <br />Jurisdiction: Supreme Court of the State of New York, Westchester County <br />Opened: January 2024 <br />Closed: February 2025 – Settled <br /> <br />Plaintiff alleged that its building sustained damage as a result of the negligent design, <br />oversight, and construction on the lot adjacent to Plaintiff’s building. <br /> <br />• Crystal City Independent School District (“School District”) v. Pfluger Architects, Inc. <br />d/b/a Pfluger Associates, L.P. / Persyn Engineering, Inc., d/b/a Persyn Engineering / Don <br />Durden, Inc. d/b/a Civil Engineering Consultants (“CEC”) / Bartlett Cocke General <br />Contractors, LLC d/b/a Bartlett Cocke General Contractors <br />Case No: 24-12-15531-ZCV <br />Jurisdiction: State of Texas, District Court, 365th Judicial District <br />Opened: December 2024 <br />Closed: February 2025 – Settled <br /> <br />The defendants are the construction and design teams contracted by the School District to <br />design and then construct additions to Crystal City High School, Sterling Fly Junior High <br />School, and Benito Juarez Middle School, located in Crystal City, Texas. CEC was contracted <br />to prepare civil engineering drawings and specifications and to perform construction <br />administration services for site grading and site drainage. The School District alleges the CEC <br />is responsible for water seepage and draining water flowing into buildings and resulting <br />damage to the interior finishes and contents of the buildings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.