My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
hbc engineering company Bid Document (29)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
hbc engineering company
>
hbc engineering company Bid Document (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 3:34:07 PM
Creation date
8/31/2026 3:31:02 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HBC Engineering Company | 47 <br />WORKLOAD OF THE FIRM <br />HBC holds weekly coordination meetings to review current and upcoming workload using our internal Look <br />Ahead reports, ensuring that staffing needs are anticipated and met across all disciplines. This proactive <br />approach allows us to allocate resources efficiently and maintain schedule commitments. Throughout the <br />life of this contract with Broward County, HBC will have the capacity to manage the necessary personnel, <br />technical resources, and subconsultant support to complete all assigned tasks on time and within budget. <br />Below is a table of our active and completed projects within the past five (5) years. These projects represent <br />a cross-section of HBC’s multidisciplinary services, including roadway design, traffic engineering, drainage <br />and stormwater management, utility coordination, and construction engineering and inspection (CEI). The <br />engineering department is fully staffed, experienced in multi-agency coordination, and ready to provide <br />responsive support for this contract. <br />Description Client Status <br />100 Emerald Beach Way Ackerman LLC Closed <br />CE Downtown Intermodal Terminal (ST)AECOM Active <br /> Park & Expansion at SW 344 Street AECOM Closed <br />NW 7th St Bridge over FEC Railroad AECOM Closed <br />PD&E Willoughby Blvd AECOM Active <br />Roof Evaluation of 22 Metrorail Stations AECOM Closed <br />Port Everglades Master/Vision Plan Update AECOM Closed <br />Street Lighting Inventory and Illumination Levels <br />Study. <br />APCTE Closed <br />MOT for 8-inch Gravity Sewer on NW 37th Avenue <br />MDWASD <br />APCTE Closed <br />SR-A1A from 17th St. to Beachland Blvd APCTE Closed <br />Maintenance of Traffic (MOT) for 16”WM at 37th Ave APCTE Closed <br />Shorty’s South Tower Atlantic Pacific Companies Closed <br />Lyons Rd / Sansbury’s Way BCC Engineering Closed <br />SR7 & Weisman Way – Inter. Imprv.BCC Engineering Closed <br />PBC CSA Project # 2021025 Cherry Rd BCC Engineering Active <br />Bike Immersion Study - TPO SMART STEP BCC Engineering Active <br />Half Mile Rd BCC Engineering Closed <br />Kings Hwy BCC Engineering / FDOT 4 Closed <br />CR A1A Ocean Drive CEI Services BCC Engineering / Palm Beach County Closed <br />Hydro Geo Modeling Black & Veatch Corp.Closed <br />Water Treatment Plant Expansion at Brighton <br />Seminole Indian Resv. <br />Black & Veatch Corp.Closed <br />Blackbird Coffee & Energy Blackbird Coffee & Energy Closed <br />Site Sight Triangle Analysis Blackstone Group - Tavernier Closed <br />Sight Distance Study (Tavernier Key)Blackstone Group - Tavernier Closed <br />CEI Ser. W Hillsboro Blvd Bike Lanes Broward County Active <br />PNC2119168P1_1 - FON Wiles Road CSD-SR7 Broward County/CGA Active <br />SR 860/NE 186 St/Miami Gardens Dr at NE 12th <br />Avenue <br />Caltran Closed <br />SW 40 Street at SW 68 Avenue and SW 69 Avenue Caltran Closed
The URL can be used to link to this page
Your browser does not support the video tag.