My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2015-2386
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2015
>
Reso 2015-2386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 11:33:26 AM
Creation date
3/26/2015 3:55:23 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2015-2386
Date (mm/dd/yyyy)
03/19/2015
Description
Southern Underground Industries: Construction Project: Town Center Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
la SOUTHERN <br /> wU N D E R G R D U N D <br /> / N D U S T R / E S <br /> February 2015 <br /> Ms. Elka Linton-Dorsett <br /> Capital Projects Manager, Public Works Department <br /> City of Sunny Isles Beach <br /> 18070 Collins Avenue <br /> Sunny Isles Beach, FL 33160 <br /> Project: Small Construction Projects, No, 14-10-02 <br /> Re: Proposal to Remove & Replace ADA Sidewalk Ramps to Restroom at Town <br /> Center Park <br /> Ms. Linton-Dorsett, <br /> As per your request, Southern Underground Industries has reviewed the existing site <br /> conditions and the proposed plan(attached) to demolish and replace the existing sidewalk <br /> ramp that leads to the restrooms at Town Center Park. Based on our site visit and <br /> discussions on January 9, 2015, the following is our understanding of the scope of work <br /> SCOPE OF WORK: Labor, equipment, and material necessary to install: <br /> > Mobilization/Survey/Asbuilt <br /> > Provide temporary Fencing around the work area <br /> > Provide 2 temporary bathroom facilities(Port-o-Potty) for the park patrons <br /> > Remove & Dispose Existing sidewalk around the perimeter of the restroom and the <br /> existing concrete ramp. <br /> > Install a new 6" thick sidewalk as per the attached design. <br /> > Furnish & Install a vending machine canopy and frame on restroom building. <br /> > Provide fill and sod as necessary to match existing. grades around the perimeter of <br /> the new sidewalk. <br /> Based on this scope of work and as per the detailed breakdown attached, Southern <br /> Underground Industries proposes to complete this work for a price of S29,894.13 and we <br /> will need 1-2 weeks to complete all work after obtaining a City building permit. It may be <br /> in the City's best interest to add a contingency to this proposal for any unforeseen or <br /> additional work that may arise. Feel free to call me with any questions regarding this <br /> proposal further. Thank you for the opportunity. <br /> Sincerely. <br /> Juan B rreneche. P.E.. Vice President <br /> Southern Underground Industries, Inc. <br /> 3453 NW 44 Street, Suite 205, Oakland Park, FL 33309 (954)650-4699 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.